IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

90

matching recommendations
Reset
NAICS 336 Transportation Equipment Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0057 # 05 Y:2015 05 2015 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,903 $200 Not Implemented
BS0057 # 06 Y:2015 06 2015 INSTALL TIMERS AND/OR THERMOSTATS $332 $116 Not Implemented
BS0057 # 07 Y:2015 07 2015 UPGRADE CONTROLS ON COMPRESSORS $11,687 $16,725 Not Implemented
OR0630 # 04 Y:2014 04 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,626 $500 Implemented
OR0630 # 05 Y:2014 05 2014 RECOVER WASTE HEAT FROM EQUIPMENT $1,074 $6,924 Not Implemented
OR0630 # 03 Y:2014 03 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,588 $175,982 Implemented
OR0630 # 02 Y:2014 02 2014 ADJUST BURNERS FOR EFFICIENT OPERATION $1,503 $1,500 Implemented
OR0630 # 01 Y:2014 01 2014 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,792 $500 Implemented
BS0030 # 01 Y:2014 01 2014 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,042 $1,697 Implemented
BS0030 # 02 Y:2014 02 2014 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $4,268 $11,600 Not Implemented
BS0030 # 03 Y:2014 03 2014 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,073 $23,840 Not Implemented
BS0030 # 04 Y:2014 04 2014 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS $2,459 $2,500 Not Implemented
BS0017 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,115 $2,167 Implemented
BS0017 # 05 Y:2013 05 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $998 $1,134 Not Implemented
BS0017 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $207 $48 Implemented
BS0017 # 03 Y:2013 03 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,029 $4,500 Implemented
BS0017 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $391 $977 Implemented
BS0017 # 01 Y:2013 01 2013 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $268 $182 Implemented
UW0054 # 01 Y:2011 01 2011 REPLACE BROKEN WINDOWS AND/OR WINDOW SASH $25,410 $190,516 Not Implemented
UW0054 # 02 Y:2011 02 2011 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,537 $50,000 Not Implemented
UW0054 # 03 Y:2011 03 2011 INSTALL OCCUPANCY SENSORS $3,619 $2,700 Not Implemented
UW0024 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,517 $48,000 Implemented
UW0024 # 02 Y:2009 02 2009 USE POWER DURING OFF-PEAK PERIODS $4,202 $400 Not Implemented
UW0024 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $0 Implemented
UW0024 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $889 $0 Implemented