Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
46
matching recommendationsNAICS | 336413 | Other Aircraft Parts and Auxiliary Equipment Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2405 # 02 Y:2024 | 02 | 2024 | MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT | $4,277 | $12,000 | n/a |
UW2405 # 03 Y:2024 | 03 | 2024 | INSULATE BARE EQUIPMENT | $24,745 | $24,732 | n/a |
UW2405 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $16,834 | $25,000 | n/a |
UW2405 # 04 Y:2024 | 04 | 2024 | CROSS-TRAIN PERSONNEL TO AVOID LOST TIME | $150,000 | $200,000 | n/a |
UW2401 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,204 | $23,347 | n/a |
UW2401 # 06 Y:2024 | 06 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $26,650 | $58,013 | n/a |
UW2401 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,098 | $26,080 | n/a |
UW2401 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,688 | $3,000 | n/a |
UW2401 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,711 | $4,441 | n/a |
UW2401 # 01 Y:2024 | 01 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $141,044 | $149,500 | n/a |
UW2319 # 01 Y:2023 | 01 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $56,470 | $23,651 | n/a |
UW2319 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,789 | $3,000 | n/a |
UW2319 # 06 Y:2023 | 06 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $750,000 | $871,000 | n/a |
UW2319 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,837 | $2,080 | n/a |
UW2319 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,001 | $2,820 | n/a |
UW2319 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,443 | $68,000 | n/a |
UW2311 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $6,427 | $15,722 | n/a |
UW2311 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $26,668 | $83,148 | n/a |
UW2311 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $470 | $2,080 | n/a |
UW2311 # 04 Y:2023 | 04 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $112,574 | $693,588 | n/a |
UW2311 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $11,250 | $49,905 | n/a |
UW2310 # 01 Y:2023 | 01 | 2023 | REPLACE HEAT TREATING OVEN WITH MORE EFFICIENT UNIT | $29,254 | $128,809 | n/a |
UW2310 # 02 Y:2023 | 02 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $153,154 | $859,050 | n/a |
UW2310 # 03 Y:2023 | 03 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,425 | $1,000 | n/a |
UW2310 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,210 | $16,378 | n/a |