Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
79
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0068 # 05 Y:2015 | 05 | 2015 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,480 | $11,240 | Not Implemented |
BS0068 # 03 Y:2015 | 03 | 2015 | AIR CONDITION ONLY SPACE NECESSARY | $1,060 | $4,455 | Not Implemented |
BS0068 # 02 Y:2015 | 02 | 2015 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $1,272 | $5,853 | Not Implemented |
BS0068 # 01 Y:2015 | 01 | 2015 | USE OPTIMUM THICKNESS INSULATION | $70 | $51 | Not Implemented |
BS0068 # 04 Y:2015 | 04 | 2015 | USE OPTIMUM THICKNESS INSULATION | $29 | $100 | Not Implemented |
OR0661 # 04 Y:2015 | 04 | 2015 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $10,575 | $3,600 | Not Implemented |
OR0661 # 03 Y:2015 | 03 | 2015 | INSULATE BARE EQUIPMENT | $1,989 | $170 | Implemented |
OR0661 # 01 Y:2015 | 01 | 2015 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $52,251 | $18,807 | Implemented |
OR0661 # 02 Y:2015 | 02 | 2015 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $76,637 | $205,256 | Not Implemented |
OR0661 # 05 Y:2015 | 05 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,783 | $2,340 | Not Implemented |
OR0660 # 02 Y:2015 | 02 | 2015 | INSTALL OCCUPANCY SENSORS | $3,310 | $8,500 | Implemented |
OR0660 # 01 Y:2015 | 01 | 2015 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $135,000 | $250,000 | Implemented |
OR0660 # 03 Y:2015 | 03 | 2015 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,283 | $1,500 | Implemented |
OR0660 # 04 Y:2015 | 04 | 2015 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,242 | $54,525 | Not Implemented |
OR0659 # 07 Y:2015 | 07 | 2015 | INSULATE BARE EQUIPMENT | $1,353 | $8,000 | Implemented |
OR0659 # 08 Y:2015 | 08 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,463 | $0 | Not Implemented |
OR0659 # 06 Y:2015 | 06 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,165 | $3,410 | Not Implemented |
OR0659 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,705 | $20,000 | Implemented |
OR0659 # 05 Y:2015 | 05 | 2015 | IMPROVE COMBUSTION CONTROL CAPABILITY | $4,259 | $5,617 | Not Implemented |
OR0659 # 04 Y:2015 | 04 | 2015 | INSULATE BARE EQUIPMENT | $6,192 | $8,000 | Implemented |
OR0659 # 02 Y:2015 | 02 | 2015 | MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT | $26,260 | $7,200 | Implemented |
OR0659 # 03 Y:2015 | 03 | 2015 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $906 | $900 | Not Implemented |
BS0065 # 01 Y:2015 | 01 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,229 | $46,340 | Implemented |
BS0065 # 02 Y:2015 | 02 | 2015 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,215 | $10,715 | Not Implemented |
BS0065 # 03 Y:2015 | 03 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,088 | $160 | Implemented |