IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

427

matching recommendations
Reset
SIC 20 Food and Kindred Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UW0035 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,700 $2,000 Implemented
UW0023 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,974 $120,000 Implemented
UW0023 # 02 Y:2009 02 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,851 $2,500 Implemented
UW0023 # 03 Y:2009 03 2009 ADJUST BURNERS FOR EFFICIENT OPERATION $7,267 $200,000 Implemented
UW0023 # 04 Y:2009 04 2009 CONTROL PRESSURE ON STEAMER OPERATIONS $6,132 $0 Not Implemented
UW0023 # 05 Y:2009 05 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,120 $60,200 Not Implemented
UW0011 # 01 Y:2008 01 2008 REPLACE BOILER $8,882 $23,870 Not Implemented
UW0011 # 02 Y:2008 02 2008 INSULATE BARE EQUIPMENT $7,908 $15,906 Not Implemented
UW0011 # 03 Y:2008 03 2008 SELL COMBUSTIBLE WASTE $5,774 $0 Not Implemented
UW0011 # 04 Y:2008 04 2008 USE SOLAR HEAT TO HEAT WATER $5,523 $20,275 Not Implemented
UW0011 # 05 Y:2008 05 2008 INSTALL SKYLIGHTS $5,089 $26,250 Not Implemented
UW0011 # 06 Y:2008 06 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,444 $0 Not Implemented
UW0011 # 07 Y:2008 07 2008 INSTALL OCCUPANCY SENSORS $1,476 $300 Not Implemented
OR0511 # 01 Y:2006 01 2006 $1,200,000 $400,000 Implemented
OR0511 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $35,500 $8,000 Implemented
OR0511 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $10,500 $7,340 Not Implemented
OR0511 # 04 Y:2006 04 2006 INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM $14,400 $13,700 Implemented
OR0511 # 05 Y:2006 05 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $10,800 $0 Implemented
OR0511 # 06 Y:2006 06 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,300 $6,300 Implemented
OR0511 # 07 Y:2006 07 2006 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $3,800 $4,500 Not Implemented
OR0511 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,600 $5,000 Implemented
OR0511 # 09 Y:2006 09 2006 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $2,400 $2,600 Not Implemented
OR0510 # 01 Y:2006 01 2006 CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT $61,000 $40,000 Implemented
OR0510 # 02 Y:2006 02 2006 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $15,000 $11,600 Not Implemented
OR0510 # 03 Y:2006 03 2006 RECOVER WASTE HEAT FROM EQUIPMENT $12,200 $35,000 Implemented