IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

128

matching recommendations
Reset
SIC 37 Transportation Equipment
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0017 # 03 Y:2013 03 2013 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,029 $4,500 Implemented
BS0017 # 04 Y:2013 04 2013 INSTALL OCCUPANCY SENSORS $207 $48 Implemented
BS0017 # 05 Y:2013 05 2013 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $998 $1,134 Not Implemented
BS0017 # 06 Y:2013 06 2013 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $2,115 $2,167 Implemented
UW0024 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,517 $48,000 Implemented
UW0024 # 02 Y:2009 02 2009 USE POWER DURING OFF-PEAK PERIODS $4,202 $400 Not Implemented
UW0024 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,586 $0 Implemented
UW0024 # 04 Y:2009 04 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $889 $0 Implemented
UW0024 # 05 Y:2009 05 2009 MINIMIZE WATER USAGE $3,573 $0 Implemented
UW0007 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,370 $62,800 Implemented
UW0007 # 02 Y:2007 02 2007 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,257 $3,146 Not Implemented
UW0007 # 03 Y:2007 03 2007 USE SOLAR HEAT TO MAKE ELECTRICTY $1,315 $585 Not Implemented
UW0007 # 04 Y:2007 04 2007 INSTALL OCCUPANCY SENSORS $98 $355 Implemented
UW0003 # 01 Y:2007 01 2007 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,385 $50,000 Not Implemented
UW0003 # 02 Y:2007 02 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $929 $2,100 Implemented
UW0003 # 03 Y:2007 03 2007 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,723 $20,750 Not Implemented
UW0003 # 04 Y:2007 04 2007 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,551 $7,020 Implemented
UW0003 # 05 Y:2007 05 2007 INSTALL OCCUPANCY SENSORS $905 $1,200 Implemented
OR0512 # 01 Y:2006 01 2006 INSTALL OCCUPANCY SENSORS $100,600 $5,500 Implemented
OR0512 # 02 Y:2006 02 2006 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $32,700 $20,600 Not Implemented
OR0512 # 03 Y:2006 03 2006 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,000 $5,000 Implemented
OR0512 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,300 $5,000 Implemented
OR0512 # 05 Y:2006 05 2006 UPGRADE CONTROLS ON COMPRESSORS $4,400 $7,500 Implemented
OR0396 # 01 Y:2001 01 2001 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $164,000 $5,000 Implemented
OR0396 # 02 Y:2001 02 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $167,300 $38,000 Implemented