Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,692
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UW2401 # 04 Y:2024 | 04 | 2024 | OPTIMIZE PLANT POWER FACTOR | $6,204 | $23,347 | n/a |
UW2401 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,098 | $26,080 | n/a |
UW2401 # 02 Y:2024 | 02 | 2024 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,688 | $3,000 | n/a |
UW2401 # 01 Y:2024 | 01 | 2024 | LEVEL ONE – ADD COMMUNICATION USING IIOT DEVICES TO EXISTING CONTROL SYSTEM TO MODIFY OPERATIONS | $141,044 | $149,500 | n/a |
UW2401 # 03 Y:2024 | 03 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,711 | $4,441 | n/a |
UW2401 # 06 Y:2024 | 06 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $26,650 | $58,013 | n/a |
UW2319 # 01 Y:2023 | 01 | 2023 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $56,470 | $23,651 | n/a |
UW2319 # 06 Y:2023 | 06 | 2023 | USER BATTERY STORAGE FOR POWER QUALITY ISSUES | $750,000 | $871,000 | n/a |
UW2319 # 04 Y:2023 | 04 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $11,443 | $68,000 | n/a |
UW2319 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,001 | $2,820 | n/a |
UW2319 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $18,837 | $2,080 | n/a |
UW2319 # 05 Y:2023 | 05 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,789 | $3,000 | n/a |
UW2318 # 03 Y:2023 | 03 | 2023 | UPGRADE OBSOLETE EQUIPMENT | $376 | $5,862 | n/a |
UW2318 # 01 Y:2023 | 01 | 2023 | RECOVER AND REUSE COOLING WATER | $345,363 | $28,215 | n/a |
UW2318 # 02 Y:2023 | 02 | 2023 | INSTALL OCCUPANCY SENSORS | $67 | $180 | n/a |
UW2317 # 05 Y:2023 | 05 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | n/a |
UW2317 # 02 Y:2023 | 02 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $658 | $1,096 | n/a |
UW2317 # 03 Y:2023 | 03 | 2023 | INSTALL STORM WINDOWS AND DOORS | $156 | $1,901 | n/a |
UW2317 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $533 | $0 | n/a |
UW2317 # 04 Y:2023 | 04 | 2023 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $31,756 | $1,000,000 | n/a |
UW2316 # 03 Y:2023 | 03 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $37,897 | $192,325 | n/a |
UW2316 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $705 | $2,080 | n/a |
UW2316 # 02 Y:2023 | 02 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $73,471 | $88,000 | n/a |
UW2315 # 02 Y:2023 | 02 | 2023 | IMPROVE COMBUSTION CONTROL CAPABILITY | $30,104 | $300,000 | n/a |
UW2315 # 03 Y:2023 | 03 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,343 | $10,879 | n/a |