Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
76
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0512 # 05 Y:2006 | 05 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $4,400 | $7,500 | Implemented |
OR0512 # 04 Y:2006 | 04 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,300 | $5,000 | Implemented |
OR0512 # 03 Y:2006 | 03 | 2006 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $7,000 | $5,000 | Implemented |
OR0512 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $32,700 | $20,600 | Not Implemented |
OR0512 # 01 Y:2006 | 01 | 2006 | INSTALL OCCUPANCY SENSORS | $100,600 | $5,500 | Implemented |
OR0511 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,500 | $7,340 | Not Implemented |
OR0511 # 01 Y:2006 | 01 | 2006 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $1,200,000 | $400,000 | Implemented |
OR0511 # 02 Y:2006 | 02 | 2006 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $35,500 | $8,000 | Implemented |
OR0511 # 04 Y:2006 | 04 | 2006 | INSTALL DIRECT ACTING UNITS IN PLACE OF COMPRESSED AIR PRESSURE SYSTEM IN SAFETY SYSTEM | $14,400 | $13,700 | Implemented |
OR0511 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $10,800 | $0 | Implemented |
OR0511 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,300 | $6,300 | Implemented |
OR0511 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $3,800 | $4,500 | Not Implemented |
OR0511 # 08 Y:2006 | 08 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,600 | $5,000 | Implemented |
OR0511 # 09 Y:2006 | 09 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $2,400 | $2,600 | Not Implemented |
OR0510 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $12,200 | $35,000 | Implemented |
OR0510 # 01 Y:2006 | 01 | 2006 | CAREFULLY CONTROL WATER LEVEL IN MASS FINISHING EQUIPMENT | $61,000 | $40,000 | Implemented |
OR0510 # 02 Y:2006 | 02 | 2006 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $15,000 | $11,600 | Not Implemented |
OR0510 # 04 Y:2006 | 04 | 2006 | INSULATE BARE EQUIPMENT | $11,250 | $13,600 | Not Implemented |
OR0510 # 05 Y:2006 | 05 | 2006 | INSTALL SKYLIGHTS | $4,750 | $12,400 | Not Implemented |
OR0510 # 06 Y:2006 | 06 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,480 | $5,000 | Not Implemented |
OR0510 # 07 Y:2006 | 07 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,900 | $19,200 | Implemented |
OR0509 # 04 Y:2006 | 04 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $660 | $240 | Implemented |
OR0509 # 05 Y:2006 | 05 | 2006 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,300 | $650 | Not Implemented |
OR0509 # 03 Y:2006 | 03 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,200 | $2,250 | Implemented |
OR0509 # 02 Y:2006 | 02 | 2006 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $58,000 | $6,800 | Implemented |