IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

245

matching recommendations
Reset
SIC 3089 Plastics Products, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0143 # 10 Y:2008 10 2008 INSULATE BARE EQUIPMENT $50 $42 Not Implemented
IC0143 # 11 Y:2008 11 2008 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $6,202 $32,361 Implemented
IC0143 # 12 Y:2008 12 2008 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $541 $0 Implemented
IC0143 # 13 Y:2008 13 2008 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $195 $0 Not Implemented
WI0509 # 01 Y:2006 01 2006 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $34,120 $25,000 Not Implemented
WI0509 # 02 Y:2006 02 2006 USE CLEAN IN PLACE (CIP) SYSTEMS $24,741 $37,800 Not Implemented
WI0509 # 03 Y:2006 03 2006 INSTALL TIMERS AND/OR THERMOSTATS $6,741 $0 Not Implemented
WI0509 # 04 Y:2006 04 2006 RECOVER WASTE HEAT FROM EQUIPMENT $6,107 $1,000 Not Implemented
WI0509 # 05 Y:2006 05 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,764 $640 Not Implemented
WI0509 # 06 Y:2006 06 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,330 $0 Not Implemented
WI0509 # 07 Y:2006 07 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,189 $0 Not Implemented
WI0509 # 08 Y:2006 08 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $3,886 $3,886 Not Implemented
WI0509 # 09 Y:2006 09 2006 RECOVER WASTE HEAT FROM EQUIPMENT $769 $400 Not Implemented
WI0508 # 01 Y:2006 01 2006 $147,000 $0 Not Implemented
WI0508 # 02 Y:2006 02 2006 $30,404 $5,200 Not Implemented
WI0508 # 03 Y:2006 03 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,872 $0 Not Implemented
WI0508 # 04 Y:2006 04 2006 USE SYNTHETIC LUBRICANT $4,951 $0 Not Implemented
WI0508 # 05 Y:2006 05 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,609 $2,100 Not Implemented
WI0508 # 06 Y:2006 06 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,905 $1,280 Not Implemented
WI0508 # 07 Y:2006 07 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,615 $0 Not Implemented
WI0508 # 08 Y:2006 08 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,015 $3,200 Not Implemented
WI0508 # 09 Y:2006 09 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,628 $1,773 Not Implemented
WI0508 # 10 Y:2006 10 2006 INSTALL OCCUPANCY SENSORS $1,154 $600 Not Implemented
WI0508 # 11 Y:2006 11 2006 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $467 $156 Not Implemented
WI0507 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,310 $23,700 Not Implemented