Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
179
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WI0434 # 04 Y:2002 | 04 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,746 | $12,600 | Not Implemented |
WI0434 # 01 Y:2002 | 01 | 2002 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $133,384 | $140,000 | Not Implemented |
WI0434 # 02 Y:2002 | 02 | 2002 | INSTALL OCCUPANCY SENSORS | $9,841 | $25,000 | Not Implemented |
WI0434 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,191 | $588 | Implemented |
WI0434 # 05 Y:2002 | 05 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,556 | $740 | Implemented |
WI0434 # 06 Y:2002 | 06 | 2002 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,280 | $2,832 | Not Implemented |
WI0434 # 03 Y:2002 | 03 | 2002 | INSTALL OCCUPANCY SENSORS | $5,168 | $11,700 | Implemented |
WI0433 # 02 Y:2002 | 02 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,467 | $20,000 | Implemented |
WI0433 # 03 Y:2002 | 03 | 2002 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,530 | $1,000 | Not Implemented |
WI0433 # 01 Y:2002 | 01 | 2002 | CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING | $14,150 | $13,000 | Implemented |
WI0433 # 06 Y:2002 | 06 | 2002 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $519 | $740 | Implemented |
WI0433 # 07 Y:2002 | 07 | 2002 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $286 | $800 | Not Implemented |
WI0433 # 04 Y:2002 | 04 | 2002 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $2,251 | $1,100 | Implemented |
WI0433 # 05 Y:2002 | 05 | 2002 | INSTALL OCCUPANCY SENSORS | $1,228 | $4,000 | Implemented |
WI0432 # 04 Y:2002 | 04 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,213 | $11,042 | Not Implemented |
WI0432 # 05 Y:2002 | 05 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,052 | $150 | Implemented |
WI0432 # 01 Y:2002 | 01 | 2002 | RECOVER AND REUSE WASTE MATERIAL | $16,280 | $8,000 | Implemented |
WI0432 # 07 Y:2002 | 07 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $957 | $356 | Implemented |
WI0432 # 03 Y:2002 | 03 | 2002 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,700 | $0 | Not Implemented |
WI0432 # 02 Y:2002 | 02 | 2002 | USE EVAPORATION TO CONCENTRATE MATERIAL | $6,896 | $11,000 | n/a |
WI0432 # 06 Y:2002 | 06 | 2002 | REDUCE VENTILATION AIR | $2,842 | $8,000 | Not Implemented |
WI0431 # 05 Y:2002 | 05 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $205 | $0 | Implemented |
WI0431 # 06 Y:2002 | 06 | 2002 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $369 | $525 | Not Implemented |
WI0431 # 02 Y:2002 | 02 | 2002 | INSTALL TIMERS AND/OR THERMOSTATS | $1,742 | $600 | Implemented |
WI0431 # 08 Y:2002 | 08 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $254 | $90 | Implemented |