IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

179

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0434 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,746 $12,600 Not Implemented
WI0434 # 01 Y:2002 01 2002 USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL $133,384 $140,000 Not Implemented
WI0434 # 02 Y:2002 02 2002 INSTALL OCCUPANCY SENSORS $9,841 $25,000 Not Implemented
WI0434 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,191 $588 Implemented
WI0434 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,556 $740 Implemented
WI0434 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,280 $2,832 Not Implemented
WI0434 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $5,168 $11,700 Implemented
WI0433 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,467 $20,000 Implemented
WI0433 # 03 Y:2002 03 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,530 $1,000 Not Implemented
WI0433 # 01 Y:2002 01 2002 CONVERT FROM BATCH OPERATION TO CONTINUOUS PROCESSING $14,150 $13,000 Implemented
WI0433 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $519 $740 Implemented
WI0433 # 07 Y:2002 07 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $286 $800 Not Implemented
WI0433 # 04 Y:2002 04 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $2,251 $1,100 Implemented
WI0433 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $1,228 $4,000 Implemented
WI0432 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,213 $11,042 Not Implemented
WI0432 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,052 $150 Implemented
WI0432 # 01 Y:2002 01 2002 RECOVER AND REUSE WASTE MATERIAL $16,280 $8,000 Implemented
WI0432 # 07 Y:2002 07 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $957 $356 Implemented
WI0432 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,700 $0 Not Implemented
WI0432 # 02 Y:2002 02 2002 USE EVAPORATION TO CONCENTRATE MATERIAL $6,896 $11,000 n/a
WI0432 # 06 Y:2002 06 2002 REDUCE VENTILATION AIR $2,842 $8,000 Not Implemented
WI0431 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $205 $0 Implemented
WI0431 # 06 Y:2002 06 2002 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $369 $525 Not Implemented
WI0431 # 02 Y:2002 02 2002 INSTALL TIMERS AND/OR THERMOSTATS $1,742 $600 Implemented
WI0431 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $254 $90 Implemented