IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

226

matching recommendations
Reset
NAICS 332 Fabricated Metal Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0597 # 02 Y:2020 02 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,906 $0 Implemented
WV0597 # 01 Y:2020 01 2020 UPGRADE CONTROLS ON COMPRESSORS $14,898 $7,950 Not Implemented
WV0595 # 08 Y:2020 08 2020 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $188 $305 Implemented
WV0595 # 09 Y:2020 09 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $119 $85 Implemented
WV0595 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $315 $406 Implemented
WV0595 # 06 Y:2020 06 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $650 $1,100 Implemented
WV0595 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,263 $3,355 Implemented
WV0595 # 04 Y:2020 04 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,299 $4,225 Not Implemented
WV0595 # 03 Y:2020 03 2020 INSULATE BARE EQUIPMENT $1,313 $6,099 Implemented
WV0595 # 02 Y:2020 02 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,478 $12,144 Not Implemented
WV0595 # 01 Y:2020 01 2020 USE DEMAND CONTROLLER OR LOAD SHEDDER $7,138 $5,700 Not Implemented
WV0569 # 10 Y:2019 10 2019 DEVELOP A REPAIR/REPLACE POLICY $369 $521 Implemented
WV0569 # 01 Y:2019 01 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $40,139 $8,050 Not Implemented
WV0569 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,808 $15,281 Implemented
WV0569 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $13,389 $48,000 Not Implemented
WV0569 # 04 Y:2019 04 2019 UPGRADE CONTROLS ON COMPRESSORS $5,281 $4,000 Not Implemented
WV0569 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,167 $5,053 Not Implemented
WV0569 # 07 Y:2019 07 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,147 $188 Implemented
WV0569 # 06 Y:2019 06 2019 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,755 $6,300 Not Implemented
WV0569 # 09 Y:2019 09 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $592 $427 Implemented
WV0569 # 08 Y:2019 08 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $797 $25 Implemented
WV0567 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $495 $500 Implemented
WV0567 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,472 $2,150 Not Implemented
WV0567 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $1,487 $1,690 Implemented
WV0567 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $408 $563 Implemented