IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

74

matching recommendations
Reset
NAICS 3328 Coating, Engraving, Heat Treating, and Allied Activities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0597 # 04 Y:2020 04 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,394 $2,625 Implemented
WV0597 # 05 Y:2020 05 2020 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,072 $1,700 Implemented
WV0597 # 06 Y:2020 06 2020 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,029 $1,650 Not Implemented
WV0597 # 07 Y:2020 07 2020 DEVELOP A REPAIR/REPLACE POLICY $1,940 $444 Implemented
WV0597 # 08 Y:2020 08 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,418 $7,061 Not Implemented
WV0597 # 09 Y:2020 09 2020 INSTALL OCCUPANCY SENSORS $446 $1,536 Implemented
WV0567 # 08 Y:2018 08 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $495 $500 Implemented
WV0567 # 01 Y:2018 01 2018 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $11,443 $23,150 Not Implemented
WV0567 # 04 Y:2018 04 2018 INSTALL OCCUPANCY SENSORS $5,896 $6,014 Implemented
WV0567 # 02 Y:2018 02 2018 USE DEMAND CONTROLLER OR LOAD SHEDDER $5,472 $5,600 Not Implemented
WV0567 # 09 Y:2018 09 2018 DEVELOP A REPAIR/REPLACE POLICY $408 $563 Implemented
WV0567 # 05 Y:2018 05 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,472 $2,150 Not Implemented
WV0567 # 03 Y:2018 03 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $9,322 $15,000 Not Implemented
WV0567 # 07 Y:2018 07 2018 INSULATE BARE EQUIPMENT $1,487 $1,690 Implemented
WV0567 # 06 Y:2018 06 2018 RECYCLE WHITE WATER $4,061 $450 Implemented
WV0541 # 09 Y:2017 09 2017 INSTALL OCCUPANCY SENSORS $869 $1,671 Implemented
WV0541 # 01 Y:2017 01 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $62,969 $252,894 Not Implemented
WV0541 # 02 Y:2017 02 2017 INSTALL SENSORS TO DETECT DEFECTS $60,138 $100,000 Not Implemented
WV0541 # 03 Y:2017 03 2017 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $40,630 $534 Implemented
WV0541 # 04 Y:2017 04 2017 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $35,042 $29,880 Not Implemented
WV0541 # 05 Y:2017 05 2017 RECOVER WASTE HEAT FROM EQUIPMENT $29,320 $72,000 Not Implemented
WV0541 # 06 Y:2017 06 2017 DEVELOP A REPAIR/REPLACE POLICY $13,353 $1,514 Implemented
WV0541 # 07 Y:2017 07 2017 INSULATE BARE EQUIPMENT $3,860 $2,024 Implemented
WV0541 # 08 Y:2017 08 2017 USE EVAPORATION TO CONCENTRATE MATERIAL $1,206 $5,500 Not Implemented
WV0371 # 11 Y:2008 11 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,269 $530 Implemented