IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

132

matching recommendations
Reset
SIC 30 Rubber And Miscellaneous Plastics Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0358 # 12 Y:2007 12 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $468 $78 Implemented
WV0354 # 03 Y:2007 03 2007 RECOVER WASTE HEAT FROM EQUIPMENT $14,128 $900 Implemented
WV0354 # 05 Y:2007 05 2007 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,489 $1,000 Implemented
WV0354 # 06 Y:2007 06 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,629 $0 Implemented
WV0354 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,596 $32 Implemented
WV0354 # 08 Y:2007 08 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,776 $0 Implemented
WV0354 # 11 Y:2007 11 2007 DEVELOP A REPAIR/REPLACE POLICY $1,190 $408 Implemented
WV0354 # 13 Y:2007 13 2007 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $857 $504 Implemented
WV0332 # 01 Y:2006 01 2006 INSULATE BARE EQUIPMENT $26,457 $2,863 Implemented
WV0332 # 04 Y:2006 04 2006 DEVELOP A REPAIR/REPLACE POLICY $4,584 $765 Implemented
WV0332 # 05 Y:2006 05 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,028 $0 Implemented
WV0332 # 06 Y:2006 06 2006 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,921 $0 Implemented
WV0332 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,100 $8,245 Implemented
WV0218 # 02 Y:2001 02 2001 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $15,768 $13,800 Implemented
WV0218 # 03 Y:2001 03 2001 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,519 $1,362 Implemented
WV0218 # 04 Y:2001 04 2001 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $121 $60 Implemented
WV0218 # 06 Y:2001 06 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $5,713 $1,440 Implemented
WV0218 # 07 Y:2001 07 2001 INSULATE BARE EQUIPMENT $1,985 $276 Implemented
WV0218 # 08 Y:2001 08 2001 INSULATE BARE EQUIPMENT $3,625 $730 Implemented
WV0218 # 09 Y:2001 09 2001 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,088 $1,200 Implemented
WV0218 # 11 Y:2001 11 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $18,480 $9,000 Implemented
WV0192 # 01 Y:2000 01 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $922 $40 Implemented
WV0192 # 03 Y:2000 03 2000 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $1,441 $800 Implemented
WV0192 # 04 Y:2000 04 2000 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $414 $65 Implemented
WV0192 # 05 Y:2000 05 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,440 $20 Implemented