Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
54
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0568 # 05 Y:2018 | 05 | 2018 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $73,200 | $3,000 | Not Implemented |
WV0568 # 04 Y:2018 | 04 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $1,251 | $562 | Implemented |
WV0568 # 03 Y:2018 | 03 | 2018 | PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT | $3,286 | $3,400 | Implemented |
WV0568 # 02 Y:2018 | 02 | 2018 | CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS | $9,840 | $2,800 | Implemented |
WV0568 # 01 Y:2018 | 01 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $11,605 | $52,080 | Not Implemented |
WV0567 # 08 Y:2018 | 08 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $495 | $500 | Implemented |
WV0567 # 06 Y:2018 | 06 | 2018 | RECYCLE WHITE WATER | $4,061 | $450 | Implemented |
WV0567 # 09 Y:2018 | 09 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $408 | $563 | Implemented |
WV0567 # 02 Y:2018 | 02 | 2018 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $5,472 | $5,600 | Not Implemented |
WV0567 # 07 Y:2018 | 07 | 2018 | INSULATE BARE EQUIPMENT | $1,487 | $1,690 | Implemented |
WV0567 # 05 Y:2018 | 05 | 2018 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,472 | $2,150 | Not Implemented |
WV0567 # 04 Y:2018 | 04 | 2018 | INSTALL OCCUPANCY SENSORS | $5,896 | $6,014 | Implemented |
WV0567 # 03 Y:2018 | 03 | 2018 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $9,322 | $15,000 | Not Implemented |
WV0567 # 01 Y:2018 | 01 | 2018 | REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES | $11,443 | $23,150 | Not Implemented |
WV0561 # 05 Y:2018 | 05 | 2018 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,253 | $6,000 | Not Implemented |
WV0561 # 01 Y:2018 | 01 | 2018 | INSTALL SET-BACK TIMERS | $15,007 | $2,522 | Implemented |
WV0561 # 02 Y:2018 | 02 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,102 | $13,629 | Implemented |
WV0561 # 03 Y:2018 | 03 | 2018 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,765 | $1,784 | Implemented |
WV0561 # 04 Y:2018 | 04 | 2018 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,742 | $171 | Implemented |
WV0561 # 07 Y:2018 | 07 | 2018 | DEVELOP A REPAIR/REPLACE POLICY | $471 | $696 | Implemented |
WV0561 # 08 Y:2018 | 08 | 2018 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $321 | $34 | Implemented |
WV0561 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $535 | $1,400 | Implemented |
WV0560 # 05 Y:2018 | 05 | 2018 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,101 | $10,000 | Implemented |
WV0560 # 06 Y:2018 | 06 | 2018 | MINIMIZE WATER USAGE | $1,679 | $1,400 | Implemented |
WV0560 # 07 Y:2018 | 07 | 2018 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,007 | $1,200 | Implemented |