IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0420 # 04 Y:2012 04 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $857 $2,925 Not Implemented
BD0420 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $756 $2,100 Not Implemented
BD0420 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $746 $20 Not Implemented
BD0420 # 07 Y:2012 07 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $608 $3,000 Not Implemented
BD0420 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $130 $275 Not Implemented
UA0091 # 03 Y:2012 03 2012 INSTALL TIMERS AND/OR THERMOSTATS $2,368 $546 Implemented
UA0091 # 04 Y:2012 04 2012 REDUCE VENTILATION AIR $132 $210 Not Implemented
SU0328 # 01 Y:2012 01 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $164 $0 Implemented
SU0328 # 02 Y:2012 02 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,399 $1,890 Not Implemented
SU0328 # 03 Y:2012 03 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $678 $611 Implemented
SU0328 # 04 Y:2012 04 2012 ELIMINATE/REDUCE AN OPERATION $4,336 $4,060 Not Implemented
SU0328 # 05 Y:2012 05 2012 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,923 $2,382 Implemented
SU0328 # 06 Y:2012 06 2012 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $309 $758 Not Implemented
SU0328 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $13,560 $54,280 Implemented
DL0099 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,066 $12,089 Implemented
DL0099 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,900 $11,930 Implemented
DL0099 # 03 Y:2012 03 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,698 $17,843 Implemented
DL0099 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,410 $100 Implemented
DL0099 # 05 Y:2012 05 2012 USE OPTIMUM TEMPERATURE $2,940 $100 Implemented
DL0099 # 06 Y:2012 06 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $320,000 $3,600,000 Not Implemented
AM0626 # 01 Y:2012 01 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $10,800 $600 Not Implemented
AM0626 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,300 $19,670 Implemented
AM0626 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,990 $350 Implemented
AM0626 # 04 Y:2012 04 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $975 $15 Implemented
AM0626 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $285 $0 Implemented