IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,043

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UA3031 # 04 Y:2013 04 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $174 $3,355 Not Implemented
UA3031 # 03 Y:2013 03 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $3,045 $23,550 Implemented
UA3031 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,389 $7,400 Implemented
UA3031 # 01 Y:2013 01 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,783 $400 Implemented
UA0112 # 01 Y:2013 01 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,737 $19,304 Not Implemented
UA0112 # 02 Y:2013 02 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,385 $2,330 Implemented
UA0112 # 03 Y:2013 03 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,177 $878 Implemented
UA0112 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $23,965 $49,792 Not Implemented
UA0112 # 05 Y:2013 05 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,143 $520 Not Implemented
MA0721 # 09 Y:2013 09 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $1,465 $1,650 Not Implemented
MA0721 # 08 Y:2013 08 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,106 $6,390 Not Implemented
MA0721 # 07 Y:2013 07 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,130 $1,020 Implemented
MA0721 # 06 Y:2013 06 2013 REPAIR AND ELIMINATE STEAM LEAKS $2,358 $1,120 Implemented
MA0721 # 05 Y:2013 05 2013 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,474 $200 Implemented
MA0721 # 04 Y:2013 04 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,864 $200 Implemented
MA0721 # 03 Y:2013 03 2013 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $7,493 $11,000 Implemented
MA0721 # 02 Y:2013 02 2013 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $10,906 $7,500 Implemented
MA0721 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $15,477 $1,400 Not Implemented
BS0026 # 01 Y:2013 01 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $339 $120 Implemented
BS0026 # 02 Y:2013 02 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $478 $15 Implemented
BS0026 # 03 Y:2013 03 2013 REUSE HIGH FERROUS METAL DUST AS RAW MATERIAL $1,699 $1,382 Not Implemented
BS0026 # 04 Y:2013 04 2013 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,850 $752 Implemented
AM0648 # 11 Y:2013 11 2013 INSULATE BARE EQUIPMENT $101 $308 Not Implemented
AM0648 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,116 $9 Implemented
AM0648 # 09 Y:2013 09 2013 USE SYNTHETIC LUBRICANT $2,016 $0 Implemented