IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS1901 # 04 Y:2019 04 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $1,150 $100 Implemented
LS1901 # 05 Y:2019 05 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $45,500 $27,000 Not Implemented
LS1901 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,246 $21,652 Not Implemented
SD0574 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $1,259 $0 Implemented
SD0574 # 02 Y:2019 02 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $886 $300 Implemented
SD0574 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $485 $1,290 Not Implemented
SD0574 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $332 $0 Not Implemented
SD0574 # 05 Y:2019 05 2019 REDUCE SCRAP PRODUCTION $25,514 $1,500 Implemented
UA0203 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,597 $23,433 Implemented
UA0203 # 02 Y:2019 02 2019 USE PHOTOCELL CONTROLS $1,777 $7,719 Implemented
UA0203 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,238 $2,765 Implemented
UA0203 # 04 Y:2019 04 2019 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $3,434 $8,870 Not Implemented
UA0203 # 05 Y:2019 05 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,053 $200 Implemented
UA0203 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $3,682 $2,568 Implemented
UA0203 # 07 Y:2019 07 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $567 $486 Implemented
UU0140 # 01 Y:2019 01 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $22,415 $2,000 Implemented
UU0140 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $6,232 $9,119 Not Implemented
UU0140 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,922 $2,000 Implemented
UU0140 # 04 Y:2019 04 2019 TURN OFF EQUIPMENT WHEN NOT IN USE $4,500 $0 Implemented
UU0140 # 05 Y:2019 05 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,388 $3,125 Not Implemented
UU0140 # 06 Y:2019 06 2019 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $831 $400 Implemented
UU0140 # 07 Y:2019 07 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $655 $748 Not Implemented
IP0112 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $23,973 $5 Implemented
IP0112 # 02 Y:2019 02 2019 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $756 $0 Not Implemented
IP0112 # 03 Y:2019 03 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,835 $130 Implemented