IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

88

matching recommendations
Reset
NAICS 212 Mining (except Oil and Gas)
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0550 # 03 Y:2023 03 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,539 $3,500 Implemented
LE0550 # 05 Y:2023 05 2023 ELIMINATE A BY-PRODUCT $85,450 $350,000 Implemented
LE0550 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,663 $100 Implemented
LE0550 # 02 Y:2023 02 2023 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $1,474 $2,500 Implemented
LE0550 # 07 Y:2023 07 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,791 $34,566 Implemented
UU0193 # 02 Y:2022 02 2022 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $371,933 $40,000 Implemented
UU0193 # 01 Y:2022 01 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $269,225 $7,636,800 Implemented
UU0193 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,764 $4,720 Implemented
UU0193 # 04 Y:2022 04 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,736 $1,307 Implemented
UU0193 # 05 Y:2022 05 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,875 $5,000 Implemented
TT0238 # 04 Y:2020 04 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,965 $22,780 Implemented
TT0238 # 06 Y:2020 06 2020 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $6,836 $1,500 Implemented
TT0238 # 01 Y:2020 01 2020 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $28,385 $3,500 Implemented
TT0238 # 08 Y:2020 08 2020 TURN OFF EQUIPMENT WHEN NOT IN USE $511 $40 Implemented
TT0238 # 07 Y:2020 07 2020 INSTALL / REPAIR INSULATION ON STEAM LINES $1,527 $350 Implemented
TT0238 # 02 Y:2020 02 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,091 $75,890 Implemented
WM0138 # 06 Y:2019 06 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,375 $11,900 Implemented
WM0138 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,430 $30,453 Implemented
WM0138 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,481 $34,315 Implemented
SU0478 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,321 $75,548 Implemented
SU0478 # 04 Y:2019 04 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $385 $528 Implemented
UU0148 # 03 Y:2019 03 2019 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $205,559 $25,240 Implemented
UU0148 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,667 $8,267 Implemented
UU0148 # 02 Y:2019 02 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $292,277 $82,400 Implemented
UU0145 # 06 Y:2019 06 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,250 $4,719 Implemented