Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
222
matching recommendationsNAICS | 212 | Mining (except Oil and Gas) |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0672 # 05 Y:2015 | 05 | 2015 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $9,615 | $1,000 | Implemented |
AM0672 # 06 Y:2015 | 06 | 2015 | USE SYNTHETIC LUBRICANT | $8,670 | $0 | Not Implemented |
AM0672 # 07 Y:2015 | 07 | 2015 | TURN OFF EQUIPMENT WHEN NOT IN USE | $8,500 | $210 | Implemented |
AM0672 # 08 Y:2015 | 08 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,645 | $1,200 | Implemented |
AM0672 # 09 Y:2015 | 09 | 2015 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $3,925 | $1,000 | Not Implemented |
AM0672 # 10 Y:2015 | 10 | 2015 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,550 | $4,730 | Not Implemented |
OR0621 # 01 Y:2013 | 01 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,962 | $2,256 | Not Implemented |
OR0621 # 02 Y:2013 | 02 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,765 | $65,592 | Implemented |
OR0621 # 03 Y:2013 | 03 | 2013 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $423 | $13,505 | Not Implemented |
MA0696 # 01 Y:2012 | 01 | 2012 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $19,393 | $39,000 | Implemented |
MA0696 # 02 Y:2012 | 02 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $15,781 | $2,800 | Implemented |
MA0696 # 03 Y:2012 | 03 | 2012 | USE OPTIMUM TEMPERATURE | $6,647 | $4,000 | Not Implemented |
MA0696 # 04 Y:2012 | 04 | 2012 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $3,539 | $17,500 | Not Implemented |
MA0696 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,048 | $6,600 | Implemented |
MA0696 # 06 Y:2012 | 06 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,462 | $6,035 | Not Implemented |
MA0696 # 07 Y:2012 | 07 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,810 | $200 | Implemented |
MA0696 # 08 Y:2012 | 08 | 2012 | INSTALL OCCUPANCY SENSORS | $1,705 | $4,080 | Implemented |
MA0696 # 09 Y:2012 | 09 | 2012 | INSULATE BARE EQUIPMENT | $622 | $1,100 | Not Implemented |
LL0350 # 01 Y:2011 | 01 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $87,490 | $144,239 | Not Implemented |
LL0350 # 02 Y:2011 | 02 | 2011 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,558 | $150 | Implemented |
LL0350 # 03 Y:2011 | 03 | 2011 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $1,021 | $270 | Implemented |
LL0350 # 04 Y:2011 | 04 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $390 | $1,995 | Not Implemented |
LL0350 # 05 Y:2011 | 05 | 2011 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $268 | $375 | Not Implemented |
LL0350 # 06 Y:2011 | 06 | 2011 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $223 | $140 | Not Implemented |
LL0350 # 07 Y:2011 | 07 | 2011 | INSTALL OCCUPANCY SENSORS | $110 | $300 | Not Implemented |