IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

174

matching recommendations
Reset
NAICS 2123 Nonmetallic Mineral Mining and Quarrying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0672 # 02 Y:2015 02 2015 USE POWER DURING OFF-PEAK PERIODS $50,930 $0 Not Implemented
AM0672 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,270 $18,105 Implemented
AM0672 # 04 Y:2015 04 2015 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,480 $80,350 Implemented
AM0672 # 05 Y:2015 05 2015 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $9,615 $1,000 Implemented
AM0672 # 06 Y:2015 06 2015 USE SYNTHETIC LUBRICANT $8,670 $0 Not Implemented
AM0672 # 07 Y:2015 07 2015 TURN OFF EQUIPMENT WHEN NOT IN USE $8,500 $210 Implemented
AM0672 # 08 Y:2015 08 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,645 $1,200 Implemented
AM0672 # 09 Y:2015 09 2015 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $3,925 $1,000 Not Implemented
AM0672 # 10 Y:2015 10 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,550 $4,730 Not Implemented
OR0621 # 01 Y:2013 01 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $1,962 $2,256 Not Implemented
OR0621 # 02 Y:2013 02 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,765 $65,592 Implemented
OR0621 # 03 Y:2013 03 2013 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $423 $13,505 Not Implemented
MA0696 # 01 Y:2012 01 2012 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $19,393 $39,000 Implemented
MA0696 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $15,781 $2,800 Implemented
MA0696 # 03 Y:2012 03 2012 USE OPTIMUM TEMPERATURE $6,647 $4,000 Not Implemented
MA0696 # 04 Y:2012 04 2012 PREHEAT COMBUSTION AIR WITH WASTE HEAT $3,539 $17,500 Not Implemented
MA0696 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,048 $6,600 Implemented
MA0696 # 06 Y:2012 06 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,462 $6,035 Not Implemented
MA0696 # 07 Y:2012 07 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,810 $200 Implemented
MA0696 # 08 Y:2012 08 2012 INSTALL OCCUPANCY SENSORS $1,705 $4,080 Implemented
MA0696 # 09 Y:2012 09 2012 INSULATE BARE EQUIPMENT $622 $1,100 Not Implemented
LL0350 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $87,490 $144,239 Not Implemented
LL0350 # 02 Y:2011 02 2011 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,558 $150 Implemented
LL0350 # 03 Y:2011 03 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,021 $270 Implemented
LL0350 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $390 $1,995 Not Implemented