Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
41
matching recommendationsNAICS | 221 | Utilities |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0200 # 03 Y:2022 | 03 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,392 | $5,232 | Implemented |
UU0197 # 06 Y:2022 | 06 | 2022 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $130 | $25 | Implemented |
UU0197 # 04 Y:2022 | 04 | 2022 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,230 | $4,000 | Implemented |
UU0197 # 03 Y:2022 | 03 | 2022 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,900 | $3,000 | Implemented |
UU0197 # 01 Y:2022 | 01 | 2022 | USE POWER DURING OFF-PEAK PERIODS | $13,098 | $10,000 | Implemented |
UU0197 # 02 Y:2022 | 02 | 2022 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $12,033 | $300 | Implemented |
UU0183 # 01 Y:2021 | 01 | 2021 | SELL COMBUSTIBLE WASTE | $149,294 | $144,000 | Implemented |
UU0183 # 05 Y:2021 | 05 | 2021 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $19,111 | $20,527 | Implemented |
UU0183 # 06 Y:2021 | 06 | 2021 | USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE | $15,681 | $1,607 | Implemented |
UU0183 # 07 Y:2021 | 07 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,906 | $22,506 | Implemented |
UU0174 # 02 Y:2021 | 02 | 2021 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,383 | $85,347 | Implemented |
UU0174 # 04 Y:2021 | 04 | 2021 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $744 | $200 | Implemented |
UU0174 # 01 Y:2021 | 01 | 2021 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $24,060 | $178,852 | Implemented |
UU0169 # 03 Y:2020 | 03 | 2020 | USE OPTIMUM TEMPERATURE | $4,303 | $0 | Implemented |
UU0169 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $514 | $2,100 | Implemented |
UU0169 # 01 Y:2020 | 01 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,976 | $124,680 | Implemented |
UU0168 # 01 Y:2020 | 01 | 2020 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,906 | $0 | Implemented |
UU0168 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,729 | $15,550 | Implemented |
UU0168 # 04 Y:2020 | 04 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,063 | $0 | Implemented |
UU0168 # 05 Y:2020 | 05 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $251 | $0 | Implemented |
UU0168 # 06 Y:2020 | 06 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $178 | $0 | Implemented |
UU0163 # 03 Y:2020 | 03 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $11,324 | $5,000 | Implemented |
UU0163 # 05 Y:2020 | 05 | 2020 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $4,576 | $2,000 | Implemented |
UU0163 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,414 | $15,055 | Implemented |
UU0163 # 07 Y:2020 | 07 | 2020 | ADOPT IN-HOUSE MATERIAL GENERATION | $10,477 | $5,000 | Implemented |