IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,040

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0141 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $176,898 $256,282 Implemented
UU0141 # 03 Y:2019 03 2019 MODERATE COOLING TOWER OUTLET TEMPERATURE $149,664 $22,400 Implemented
UU0141 # 05 Y:2019 05 2019 INSTALL OCCUPANCY SENSORS $3,778 $1,225 Implemented
UA0205 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $700 $1,908 Implemented
UA0205 # 04 Y:2019 04 2019 MODIFY STARTUP/SHUTDOWN TIMES $280 $0 Implemented
BS0116 # 01 Y:2019 01 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $113 $50 Implemented
MZ0260 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,384 $25,688 Implemented
MZ0260 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $577 $450 Implemented
MZ0260 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $32,450 $7,600 Implemented
GT0919 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,773 $8,000 Implemented
GT0919 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,045 $18,576 Implemented
GT0919 # 06 Y:2018 06 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $90,950 $1,944,000 Implemented
WV0568 # 02 Y:2018 02 2018 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $9,840 $2,800 Implemented
WV0568 # 03 Y:2018 03 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,286 $3,400 Implemented
WV0568 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $1,251 $562 Implemented
LS1816 # 01 Y:2018 01 2018 INSTALL OCCUPANCY SENSORS $377 $68 Implemented
MZ0259 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,010 $29,034 Implemented
MZ0259 # 02 Y:2018 02 2018 INSTALL OCCUPANCY SENSORS $504 $780 Implemented
MZ0259 # 04 Y:2018 04 2018 RECOVER AND REUSE COOLING WATER $63,427 $203,000 Implemented
IC0209 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,273 $4,939 Implemented
UK1810 # 01 Y:2018 01 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,656 $10,541 Implemented
UK1810 # 03 Y:2018 03 2018 USE ONLY CERTIFIED MOTOR REPAIR SHOPS $902 $2,215 Implemented
UK1810 # 04 Y:2018 04 2018 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $36,700 $5,900 Implemented
UK1810 # 05 Y:2018 05 2018 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,415 $0 Implemented
UK1810 # 06 Y:2018 06 2018 REPLACE TREATED WATER WITH WELL / SURFACE WATER $22,528 $8,200 Implemented