IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,040

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0589 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,794 $15,591 Implemented
SF0589 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,635 $18,061 Implemented
SF0589 # 07 Y:2022 07 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $50,416 $292,043 Implemented
WV0628 # 03 Y:2022 03 2022 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $8,049 $1,000 Implemented
WV0628 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,802 $3,626 Implemented
WV0628 # 07 Y:2022 07 2022 DEVELOP A REPAIR/REPLACE POLICY $371 $1,608 Implemented
MA0843 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $11,001 $6,450 Implemented
MA0843 # 04 Y:2022 04 2022 USE HEAT PUMP FOR SPACE CONDITIONING $7,677 $3,875 Implemented
NL0068 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $44,258 $7,000 Implemented
NL0068 # 02 Y:2022 02 2022 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $20,357 $960 Implemented
NL0068 # 03 Y:2022 03 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $17,011 $25,884 Implemented
NL0068 # 04 Y:2022 04 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,339 $4,500 Implemented
NL0068 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,608 $5,394 Implemented
MA0842 # 02 Y:2022 02 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,685 $11,100 Implemented
MA0842 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $5,243 $7,450 Implemented
MA0842 # 05 Y:2022 05 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,119 $11,630 Implemented
AS0523 # 01 Y:2022 01 2022 PURCHASE NEW EQUIPMENT TO REDUCE MATERIAL USE / COST $42,697 $89,337 Implemented
AS0523 # 02 Y:2022 02 2022 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $10,604 $200 Implemented
AS0523 # 03 Y:2022 03 2022 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,300 $7,808 Implemented
AS0523 # 04 Y:2022 04 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,242 $2,695 Implemented
AS0523 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $414 $328 Implemented
AS0523 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $381 $32 Implemented
UF0581 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $17,084 $4,202 Implemented
UF0581 # 03 Y:2022 03 2022 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,046 $5,794 Implemented
UF0581 # 04 Y:2022 04 2022 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $5,091 $8,250 Implemented