IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

208

matching recommendations
Reset
NAICS 2213 Water, Sewage and Other Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0260 # 03 Y:2018 03 2018 INSTALL OCCUPANCY SENSORS $32,450 $7,600 Implemented
MZ0260 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $12,057 $59,524 Not Implemented
MZ0260 # 02 Y:2018 02 2018 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $577 $450 Implemented
MZ0260 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $21,384 $25,688 Implemented
MZ0260 # 04 Y:2018 04 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,122 $23,576 Not Implemented
OR0711 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,277 $1,904 Not Implemented
GT0919 # 06 Y:2018 06 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $90,950 $1,944,000 Implemented
GT0919 # 05 Y:2018 05 2018 USE SOLAR HEAT FOR HEAT $41,493 $850,000 Not Implemented
GT0919 # 04 Y:2018 04 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,910 $55,885 Not Implemented
GT0919 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,045 $18,576 Implemented
GT0919 # 02 Y:2018 02 2018 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $67,773 $8,000 Implemented
GT0919 # 01 Y:2018 01 2018 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $21,617 $400 Not Implemented
WV0568 # 05 Y:2018 05 2018 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $73,200 $3,000 Not Implemented
WV0568 # 04 Y:2018 04 2018 DEVELOP A REPAIR/REPLACE POLICY $1,251 $562 Implemented
WV0568 # 03 Y:2018 03 2018 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $3,286 $3,400 Implemented
WV0568 # 02 Y:2018 02 2018 CHANGE PRODUCT DESIGN TO REDUCE ENERGY REQUIREMENTS $9,840 $2,800 Implemented
WV0568 # 01 Y:2018 01 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,605 $52,080 Not Implemented
OR0711 # 03 Y:2018 03 2018 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,749 $10,303 Not Implemented
OR0711 # 02 Y:2018 02 2018 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $68,286 $68,224 Not Implemented
OR0711 # 01 Y:2018 01 2018 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $1,082,323 $800,001 Not Implemented
OR0711 # 05 Y:2018 05 2018 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,097 $30,240 Not Implemented
LS1816 # 05 Y:2018 05 2018 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $7,510 $13,000 Not Implemented
LS1816 # 02 Y:2018 02 2018 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,290 $265 Not Implemented
LS1816 # 03 Y:2018 03 2018 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $41,129 $25,545 Not Implemented
LS1816 # 01 Y:2018 01 2018 INSTALL OCCUPANCY SENSORS $377 $68 Implemented