Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
75
matching recommendationsNAICS | 22131 | Water Supply and Irrigation Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SJ0034 # 03 Y:2025 | 03 | 2025 | USE OPTIMUM TEMPERATURE | $3,458 | $0 | n/a |
SJ0034 # 02 Y:2025 | 02 | 2025 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,631 | $10,962 | n/a |
SJ0034 # 04 Y:2025 | 04 | 2025 | USE POWER DURING OFF-PEAK PERIODS | $1,270 | $0 | n/a |
SJ0034 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $31,541 | $106,228 | n/a |
SF0536 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,261 | $16,688 | Implemented |
SF0536 # 01 Y:2019 | 01 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,886 | $0 | Implemented |
SF0536 # 03 Y:2019 | 03 | 2019 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $47,766 | $327,497 | Not Implemented |
SF0536 # 04 Y:2019 | 04 | 2019 | USE SOLAR HEAT TO MAKE ELECTRICTY | $78,553 | $677,569 | Not Implemented |
SD0476 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,485 | $13,830 | Implemented |
SD0476 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,573 | $6,995 | Implemented |
SD0476 # 03 Y:2013 | 03 | 2013 | IMPROVE COMBUSTION CONTROL CAPABILITY | $6,115 | $200 | Not Implemented |
SD0476 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,282 | $33,000 | Implemented |
SD0476 # 01 Y:2013 | 01 | 2013 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $78,108 | $360,000 | Not Implemented |
SD0452 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,223 | $4,200 | Implemented |
SD0452 # 03 Y:2012 | 03 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,072 | $18,680 | Not Implemented |
SD0452 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,957 | $15,925 | Implemented |
SD0452 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $48,619 | $2,000 | Implemented |
SD0452 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $102,098 | $275,000 | Implemented |
SD0445 # 01 Y:2012 | 01 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $33,123 | $1,878 | Implemented |
SD0445 # 02 Y:2012 | 02 | 2012 | REDESIGN PROCESS | $30,890 | $14,775 | Not Implemented |
SD0445 # 03 Y:2012 | 03 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $64,503 | $109,675 | Not Implemented |
SD0445 # 04 Y:2012 | 04 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $351,013 | $1,040,000 | Implemented |
SD0445 # 05 Y:2012 | 05 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,844 | $39,150 | Implemented |
SD0445 # 06 Y:2012 | 06 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $84,757 | $300,000 | Implemented |
SF0389 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,881 | $9,823 | Implemented |