Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
34
matching recommendationsNAICS | 221310 | Water Supply and Irrigation Systems |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0536 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,261 | $16,688 | Implemented |
SF0536 # 01 Y:2019 | 01 | 2019 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $1,886 | $0 | Implemented |
SD0476 # 05 Y:2013 | 05 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,573 | $6,995 | Implemented |
SD0476 # 04 Y:2013 | 04 | 2013 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $5,485 | $13,830 | Implemented |
SD0476 # 02 Y:2013 | 02 | 2013 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,282 | $33,000 | Implemented |
SD0452 # 05 Y:2012 | 05 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $102,098 | $275,000 | Implemented |
SD0452 # 01 Y:2012 | 01 | 2012 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $48,619 | $2,000 | Implemented |
SD0452 # 02 Y:2012 | 02 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $24,957 | $15,925 | Implemented |
SD0452 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,223 | $4,200 | Implemented |
SD0445 # 01 Y:2012 | 01 | 2012 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $33,123 | $1,878 | Implemented |
SD0445 # 06 Y:2012 | 06 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $84,757 | $300,000 | Implemented |
SD0445 # 05 Y:2012 | 05 | 2012 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $11,844 | $39,150 | Implemented |
SD0445 # 04 Y:2012 | 04 | 2012 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $351,013 | $1,040,000 | Implemented |
SF0389 # 04 Y:2010 | 04 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $953 | $672 | Implemented |
SF0389 # 03 Y:2010 | 03 | 2010 | INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS | $6,873 | $2,392 | Implemented |
SF0389 # 02 Y:2010 | 02 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $255 | $31 | Implemented |
SF0389 # 01 Y:2010 | 01 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $10,049 | $400 | Implemented |
SF0389 # 11 Y:2010 | 11 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $812 | $7,156 | Implemented |
SF0389 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,157 | $2,712 | Implemented |
SF0389 # 08 Y:2010 | 08 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,881 | $9,823 | Implemented |
SF0389 # 09 Y:2010 | 09 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,274 | $8,179 | Implemented |
SF0389 # 10 Y:2010 | 10 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,037 | $9,053 | Implemented |
SF0389 # 06 Y:2010 | 06 | 2010 | INSTALL OCCUPANCY SENSORS | $4,881 | $7,273 | Implemented |
SF0389 # 07 Y:2010 | 07 | 2010 | USE PHOTOCELL CONTROLS | $11,135 | $19,068 | Implemented |
SD0428 # 01 Y:2010 | 01 | 2010 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $4,812 | $400 | Implemented |