IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

71

matching recommendations
Reset
NAICS 221310 Water Supply and Irrigation Systems
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0536 # 03 Y:2019 03 2019 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $47,766 $327,497 Not Implemented
SF0536 # 04 Y:2019 04 2019 USE SOLAR HEAT TO MAKE ELECTRICTY $78,553 $677,569 Not Implemented
SF0536 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,261 $16,688 Implemented
SF0536 # 01 Y:2019 01 2019 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,886 $0 Implemented
SD0476 # 04 Y:2013 04 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,485 $13,830 Implemented
SD0476 # 02 Y:2013 02 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $23,282 $33,000 Implemented
SD0476 # 01 Y:2013 01 2013 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $78,108 $360,000 Not Implemented
SD0476 # 03 Y:2013 03 2013 IMPROVE COMBUSTION CONTROL CAPABILITY $6,115 $200 Not Implemented
SD0476 # 05 Y:2013 05 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,573 $6,995 Implemented
SD0452 # 03 Y:2012 03 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,072 $18,680 Not Implemented
SD0452 # 02 Y:2012 02 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $24,957 $15,925 Implemented
SD0452 # 01 Y:2012 01 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $48,619 $2,000 Implemented
SD0452 # 04 Y:2012 04 2012 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $2,223 $4,200 Implemented
SD0452 # 05 Y:2012 05 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $102,098 $275,000 Implemented
SD0445 # 01 Y:2012 01 2012 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $33,123 $1,878 Implemented
SD0445 # 02 Y:2012 02 2012 REDESIGN PROCESS $30,890 $14,775 Not Implemented
SD0445 # 03 Y:2012 03 2012 INSTALL EQUIPMENT TO UTILIZE WASTE FUEL $64,503 $109,675 Not Implemented
SD0445 # 04 Y:2012 04 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $351,013 $1,040,000 Implemented
SD0445 # 05 Y:2012 05 2012 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $11,844 $39,150 Implemented
SD0445 # 06 Y:2012 06 2012 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $84,757 $300,000 Implemented
SF0389 # 08 Y:2010 08 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,881 $9,823 Implemented
SF0389 # 09 Y:2010 09 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,274 $8,179 Implemented
SF0389 # 07 Y:2010 07 2010 USE PHOTOCELL CONTROLS $11,135 $19,068 Implemented
SF0389 # 03 Y:2010 03 2010 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $6,873 $2,392 Implemented
SF0389 # 06 Y:2010 06 2010 INSTALL OCCUPANCY SENSORS $4,881 $7,273 Implemented