IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,521

matching recommendations
Reset
NAICS 221320 Sewage Treatment Facilities
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0845 # 02 Y:2022 02 2022 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $33,965 $13,500 Implemented
AM0845 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $9,077 $27,090 Implemented
AM0845 # 04 Y:2022 04 2022 PAY UTILITY BILLS ON TIME $1,114 $0 Implemented
AM0845 # 05 Y:2022 05 2022 INSTALL OCCUPANCY SENSORS $649 $360 Implemented
AM0845 # 06 Y:2022 06 2022 USE SYNTHETIC LUBRICANT $302 $700 Implemented
AM0845 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,709 $15,704 Implemented
AM0842 # 01 Y:2022 01 2022 ESTABLISH A PREVENTATIVE MAINTENANCE PROGRAM $4,317 $4,220 Implemented
AM0842 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $966 $3,411 Implemented
AM0842 # 03 Y:2022 03 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $110 $37 Not Implemented
MA0833 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,117 $6,950 Not Implemented
MA0833 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,258 $840 Implemented
MA0833 # 03 Y:2022 03 2022 USE HEAT PUMP FOR SPACE CONDITIONING $5,709 $2,500 Implemented
MA0833 # 04 Y:2022 04 2022 USE HEAT PUMP FOR SPACE CONDITIONING $618 $94,050 Implemented
WM0174 # 01 Y:2022 01 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,961 $8,440 Not Implemented
WM0174 # 02 Y:2022 02 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,050 $8,821 Implemented
WM0174 # 03 Y:2022 03 2022 INSTALL OCCUPANCY SENSORS $2,934 $1,200 Not Implemented
WM0174 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,034 $0 Implemented
WM0174 # 05 Y:2022 05 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,794 $0 Not Implemented
WM0174 # 06 Y:2022 06 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,216 $0 Implemented
WM0174 # 07 Y:2022 07 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $821 $735 Not Implemented
WM0174 # 08 Y:2022 08 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $716 $850 Implemented
WM0174 # 09 Y:2022 09 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $123 $0 Not Implemented
OR0747 # 01 Y:2022 01 2022 OPTIMIZE PLANT POWER FACTOR $487 $1,546 Not Implemented
OR0747 # 02 Y:2022 02 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,708 $7,587 Not Implemented
OR0747 # 03 Y:2022 03 2022 UPGRADE OBSOLETE EQUIPMENT $57,063 $757,015 Not Implemented