IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,132

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0440 # 01 Y:2003 01 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $1,842,800 $348,000 Implemented
OR0440 # 03 Y:2003 03 2003 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,500 $5,130 Implemented
OR0440 # 05 Y:2003 05 2003 ESTABLISH BURNER MAINTENANCE SCHEDULE FOR BOILERS $2,600 $700 Implemented
OR0440 # 07 Y:2003 07 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $15,500 $38,200 Implemented
OR0439 # 01 Y:2003 01 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $330,000 $790,000 Implemented
OR0439 # 03 Y:2003 03 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $10,500 $450 Implemented
OR0439 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,500 $1,850 Implemented
OR0439 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,400 $12,100 Implemented
OR0439 # 06 Y:2003 06 2003 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $3,250 $3,000 Implemented
OK0670 # 02 Y:2003 02 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,120 $0 Implemented
OK0670 # 03 Y:2003 03 2003 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $12,292 $0 Implemented
SF0269 # 02 Y:2003 02 2003 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $635 $0 Implemented
SF0269 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,653 $0 Implemented
WV0278 # 02 Y:2003 02 2003 REPAIR AND ELIMINATE STEAM LEAKS $27,508 $204 Implemented
WV0278 # 03 Y:2003 03 2003 REPAIR OR REPLACE STEAM TRAPS $23,200 $1,000 Implemented
WV0278 # 05 Y:2003 05 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $18,480 $504 Implemented
WV0278 # 08 Y:2003 08 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,418 $42 Implemented
WV0278 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,387 $7,590 Implemented
WV0278 # 10 Y:2003 10 2003 INSULATE BARE EQUIPMENT $3,709 $258 Implemented
WV0278 # 11 Y:2003 11 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,990 $0 Implemented
WV0277 # 02 Y:2003 02 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,711 $1,000 Implemented
WV0277 # 05 Y:2003 05 2003 INSULATE BARE EQUIPMENT $61,699 $29,824 Implemented
WV0277 # 06 Y:2003 06 2003 REPAIR AND ELIMINATE STEAM LEAKS $40,926 $450 Implemented
WV0277 # 07 Y:2003 07 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $40,046 $1,050 Implemented
WV0277 # 08 Y:2003 08 2003 OPTIMIZE PLANT POWER FACTOR $10,739 $62,060 Implemented