IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

50

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0645 # 01 Y:2020 01 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,683 $40,000 Implemented
NC0601 # 01 Y:2017 01 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,641 $200 Implemented
NC0601 # 04 Y:2017 04 2017 KEEP BOILER TUBES CLEAN $2,408 $1,000 Implemented
NC0586 # 01 Y:2017 01 2017 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $3,081 $2,500 Implemented
NC0586 # 02 Y:2017 02 2017 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $308 $200 Implemented
NC0586 # 03 Y:2017 03 2017 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $988 $2,500 Implemented
NC0586 # 04 Y:2017 04 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,873 $9,000 Implemented
NC0586 # 05 Y:2017 05 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $929,030 $400,000 Implemented
NC0586 # 06 Y:2017 06 2017 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,008 $2,890 Implemented
NC0586 # 07 Y:2017 07 2017 DEVELOP A REPAIR/REPLACE POLICY $2,834 $4,685 Implemented
NC0448 # 03 Y:2012 03 2012 RECOVER WASTE HEAT FROM EQUIPMENT $2,746 $5,600 Implemented
NC0448 # 04 Y:2012 04 2012 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,740 $400 Implemented
NC0448 # 05 Y:2012 05 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $880 $200 Implemented
WV0384 # 08 Y:2008 08 2008 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $870 $308 Implemented
WV0384 # 09 Y:2008 09 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $364 $438 Implemented
WV0384 # 10 Y:2008 10 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $352 $25 Implemented
WV0384 # 07 Y:2008 07 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,609 $6,026 Implemented
WV0384 # 02 Y:2008 02 2008 DEVELOP A REPAIR/REPLACE POLICY $10,724 $1,094 Implemented
NC0366 # 05 Y:2007 05 2007 INCREASE AMOUNT OF CONDENSATE RETURNED $12,430 $12,000 Implemented
NC0366 # 04 Y:2007 04 2007 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $71,297 $280,000 Implemented
WV0342 # 05 Y:2006 05 2006 PREHEAT COMBUSTION AIR WITH WASTE HEAT $76,391 $42,250 Implemented
WV0342 # 03 Y:2006 03 2006 INCREASE AMOUNT OF CONDENSATE RETURNED $103,142 $100,000 Implemented
WV0342 # 04 Y:2006 04 2006 REDUCE EXCESSIVE BOILER BLOWDOWN $87,693 $208,500 Implemented
WV0342 # 09 Y:2006 09 2006 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $26,439 $2,700 Implemented
WV0342 # 11 Y:2006 11 2006 INSULATE BARE EQUIPMENT $18,125 $2,570 Implemented