IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,485

matching recommendations
Reset
NAICS 311 Food Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WM0203 # 06 Y:2023 06 2023 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $5,100 $0 Implemented
UA0274 # 01 Y:2023 01 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $19,205 $8,523 n/a
UA0274 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $11,102 $1,000 n/a
UA0274 # 03 Y:2023 03 2023 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $15,300 $72,265 n/a
UA0274 # 04 Y:2023 04 2023 INSTALL TIMERS AND/OR THERMOSTATS $8,176 $890 n/a
UA0274 # 05 Y:2023 05 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $7,420 $26,542 n/a
UA0274 # 06 Y:2023 06 2023 INSTALL REPLACEMENT DOORS $650 $1,640 n/a
UA0274 # 07 Y:2023 07 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,122 $501 n/a
LE0551 # 01 Y:2023 01 2023 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $69,768 $5,000 Implemented
LE0551 # 02 Y:2023 02 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $203 $300 Not Implemented
LE0551 # 03 Y:2023 03 2023 INSTALL WIND POWERED ELECTRIC GENERATOR $111,339 $525,000 Implemented
UU0223 # 01 Y:2023 01 2023 ELIMINATE SHIFT $171,281 $5,500 Implemented
UU0223 # 02 Y:2023 02 2023 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $16,735 $51,600 Implemented
UU0223 # 03 Y:2023 03 2023 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $8,766 $26,767 Implemented
UU0223 # 04 Y:2023 04 2023 INCREASE AMOUNT OF CONDENSATE RETURNED $3,305 $11,743 Implemented
UU0223 # 05 Y:2023 05 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $277 $142 Implemented
LS2311 # 01 Y:2023 01 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,616 $25 Implemented
LS2311 # 02 Y:2023 02 2023 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,795 $560 Implemented
LS2311 # 03 Y:2023 03 2023 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,096 $3,700 Implemented
LS2311 # 04 Y:2023 04 2023 REPLACE BOILER $81,818 $210,000 Not Implemented
LS2311 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $11,014 $39,200 Implemented
TR0044 # 01 Y:2022 01 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $363 $1,726 Implemented
TR0044 # 02 Y:2022 02 2022 INSTALL OCCUPANCY SENSORS $921 $260 Implemented
TR0044 # 03 Y:2022 03 2022 USE SOLAR HEAT TO MAKE ELECTRICTY $109,638 $1,599,426 Not Implemented
TR0044 # 04 Y:2022 04 2022 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $8,106 $2,500 Implemented