IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

415

matching recommendations
Reset
NAICS 31142 Fruit and Vegetable Canning, Pickling, and Drying
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0249 # 23 Y:2003 23 2003 AUTOMATE PAYROLL SYSTEM $1,639 $2,500 Implemented
AS0367 # 01 Y:2004 01 2004 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $14,811 $5,240 Implemented
OR0439 # 01 Y:2003 01 2003 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $330,000 $790,000 Implemented
OR0439 # 03 Y:2003 03 2003 ADJUST BURNERS FOR EFFICIENT OPERATION $10,500 $450 Implemented
OR0439 # 04 Y:2003 04 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $4,500 $1,850 Implemented
OR0439 # 05 Y:2003 05 2003 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $5,400 $12,100 Implemented
OR0439 # 06 Y:2003 06 2003 OPTIMIZE OPERATION OF MULTI-STAGE VACUUM STEAM JETS $3,250 $3,000 Implemented
TA0050 # 02 Y:2003 02 2003 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $47,100 $5,202 Implemented
TA0050 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,258 $8,100 Implemented
TA0050 # 05 Y:2003 05 2003 UPGRADE OBSOLETE EQUIPMENT $5,795 $11,200 Implemented
TA0050 # 07 Y:2003 07 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,570 $0 Implemented
TA0050 # 08 Y:2003 08 2003 TURN OFF EQUIPMENT WHEN NOT IN USE $1,676 $0 Implemented
TA0050 # 10 Y:2003 10 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $390 $0 Implemented
WV0262 # 01 Y:2003 01 2003 INSULATE BARE EQUIPMENT $1,233 $659 Implemented
WV0262 # 03 Y:2003 03 2003 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $14,048 $1,000 Implemented
WV0262 # 05 Y:2003 05 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,273 $0 Implemented
WV0262 # 06 Y:2003 06 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,584 $0 Implemented
WV0262 # 08 Y:2003 08 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $786 $0 Implemented
WV0262 # 09 Y:2003 09 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $889 $0 Implemented
WV0262 # 10 Y:2003 10 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,757 $4,080 Implemented
WV0262 # 12 Y:2003 12 2003 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,116 $0 Implemented
WV0262 # 13 Y:2003 13 2003 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $676 $300 Implemented
WV0262 # 14 Y:2003 14 2003 REPAIR OR REPLACE STEAM TRAPS $3,018 $1,000 Implemented
WV0260 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $876 $130 Implemented
WV0260 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $597 $52 Implemented