Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
543
matching recommendationsNAICS | 31151 | Dairy Product (except Frozen) Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
LE0580 # 01 Y:2024 | 01 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,713 | $2,350 | Implemented |
LE0580 # 07 Y:2024 | 07 | 2024 | USE SOLAR HEAT TO HEAT WATER | $111,555 | $686,000 | Implemented |
LE0580 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,807 | $11,787 | Implemented |
SF0613 # 05 Y:2024 | 05 | 2024 | INSULATE FEEDWATER TANK | $1,576 | $1,977 | Implemented |
SF0613 # 08 Y:2024 | 08 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $4,505 | $22,063 | Implemented |
SF0613 # 06 Y:2024 | 06 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $466 | $1,170 | Implemented |
SF0613 # 09 Y:2024 | 09 | 2024 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $5,729 | $28,430 | Implemented |
SF0613 # 07 Y:2024 | 07 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,789 | $52,101 | Implemented |
SF0613 # 02 Y:2024 | 02 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $16,636 | $2,272 | Implemented |
SF0613 # 01 Y:2024 | 01 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,003 | $100 | Implemented |
SF0613 # 04 Y:2024 | 04 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $18,117 | $3,083 | Implemented |
SF0613 # 03 Y:2024 | 03 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $16,386 | $2,278 | Implemented |
SF0613 # 10 Y:2024 | 10 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $141,513 | $823,750 | Implemented |
SF0610 # 04 Y:2024 | 04 | 2024 | HEAT WATER WITH EXHAUST HEAT | $36,485 | $30,037 | Implemented |
SF0610 # 06 Y:2024 | 06 | 2024 | INSTALL OCCUPANCY SENSORS | $8,502 | $10,799 | Implemented |
SF0610 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $17,215 | $0 | Implemented |
SF0610 # 02 Y:2024 | 02 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $12,954 | $0 | Implemented |
SF0610 # 03 Y:2024 | 03 | 2024 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $32,003 | $15,909 | Implemented |
SF0610 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $31,683 | $31,050 | Implemented |
NL0087 # 07 Y:2023 | 07 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,789 | $100 | Implemented |
NL0087 # 03 Y:2023 | 03 | 2023 | REPAIR OR REPLACE STEAM TRAPS | $17,666 | $2,000 | Implemented |
NL0087 # 02 Y:2023 | 02 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $254,315 | $454,461 | Implemented |
SF0606 # 03 Y:2023 | 03 | 2023 | INSULATE BARE EQUIPMENT | $1,107 | $564 | Implemented |
SF0606 # 01 Y:2023 | 01 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,495 | $1,440 | Implemented |
SF0606 # 02 Y:2023 | 02 | 2023 | USE MINIMUM STEAM OPERATING PRESSURE | $5,475 | $60 | Implemented |