Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
577
matching recommendationsNAICS | 31161 | Animal Slaughtering and Processing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0880 # 07 Y:2013 | 07 | 2013 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,120 | $1,000 | Implemented |
UD0880 # 08 Y:2013 | 08 | 2013 | REDUCE EXCESSIVE BOILER BLOWDOWN | $35,463 | $15,000 | Implemented |
UD0880 # 09 Y:2013 | 09 | 2013 | INSTALL / REPAIR INSULATION ON STEAM LINES | $25,120 | $4,600 | Implemented |
UD0880 # 10 Y:2013 | 10 | 2013 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $23,091 | $25,000 | Implemented |
UD0880 # 11 Y:2013 | 11 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $3,315 | $8,000 | Implemented |
UD0880 # 12 Y:2013 | 12 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,170 | $8,000 | Implemented |
UD0880 # 13 Y:2013 | 13 | 2013 | INSULATE BARE EQUIPMENT | $3,572 | $1,221 | Implemented |
UD0880 # 14 Y:2013 | 14 | 2013 | MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE | $17,352 | $0 | Implemented |
UD0880 # 15 Y:2013 | 15 | 2013 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $6,830 | $0 | Implemented |
SD0458 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,667 | $34,450 | Implemented |
SD0457 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $77,740 | $9,900 | Implemented |
SD0457 # 04 Y:2012 | 04 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $46,364 | $89,136 | Implemented |
SD0457 # 07 Y:2012 | 07 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $17,316 | $50,240 | Implemented |
SD0457 # 10 Y:2012 | 10 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,722 | $871 | Implemented |
SD0457 # 11 Y:2012 | 11 | 2012 | REPAIR AND ELIMINATE STEAM LEAKS | $2,233 | $200 | Implemented |
UD0866 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,071 | $41,345 | Implemented |
UD0866 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,378 | $22,134 | Implemented |
UD0866 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,740 | $0 | Implemented |
UD0866 # 10 Y:2012 | 10 | 2012 | USE MINIMUM STEAM OPERATING PRESSURE | $83,103 | $83,103 | Implemented |
UD0866 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $28,807 | $0 | Implemented |
UD0866 # 15 Y:2012 | 15 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,098 | $10,982 | Implemented |
OK0833 # 01 Y:2012 | 01 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $5,700 | $5,000 | Implemented |
OK0833 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,000 | $500 | Implemented |
OK0833 # 08 Y:2012 | 08 | 2012 | LOWER COMPRESSOR PRESSURE THROUGH A/C SYSTEM MODIFICATION | $31,700 | $0 | Implemented |
OK0833 # 09 Y:2012 | 09 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $460 | $3,400 | Implemented |