IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

108

matching recommendations
Reset
NAICS 3117 Seafood Product Preparation and Packaging
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0044 # 03 Y:2014 03 2014 INSULATE BARE EQUIPMENT $338 $893 Implemented
BS0044 # 04 Y:2014 04 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $26,828 $9,000 Implemented
BS0044 # 05 Y:2014 05 2014 USE OPTIMUM THICKNESS INSULATION $9,004 $6,600 Implemented
BS0044 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $12,633 $872 Implemented
BS0044 # 08 Y:2014 08 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,695 $10,868 Implemented
BS0044 # 09 Y:2014 09 2014 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,126 $1,190 Implemented
BS0043 # 01 Y:2014 01 2014 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $63,855 $15,000 Implemented
BS0043 # 03 Y:2014 03 2014 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $111,915 $69,000 Implemented
BS0043 # 04 Y:2014 04 2014 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $13,411 $5,075 Implemented
BS0043 # 06 Y:2014 06 2014 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,075 $429 Implemented
MI0267 # 01 Y:2014 01 2014 UTILIZE A LESS EXPENSIVE COOLING METHOD $18,615 $80,000 Implemented
MI0267 # 04 Y:2014 04 2014 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $5,029 $3,340 Implemented
MI0267 # 05 Y:2014 05 2014 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,950 $429 Implemented
OR0614 # 02 Y:2013 02 2013 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $16,101 $10,000 Implemented
OR0614 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,327 $0 Implemented
MA0669 # 01 Y:2011 01 2011 REPLACE BOILER $28,774 $63,300 Implemented
MA0669 # 03 Y:2011 03 2011 OPTIMIZE PLANT POWER FACTOR $10,179 $11,190 Implemented
MA0669 # 04 Y:2011 04 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $7,848 $1,500 Implemented
MA0669 # 07 Y:2011 07 2011 INSULATE BARE EQUIPMENT $410 $550 Implemented
DL0063 # 01 Y:2010 01 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $35,600 $100 Implemented
DL0063 # 02 Y:2010 02 2010 REDUCE VENTILATION AIR $34,080 $500 Implemented
DL0063 # 03 Y:2010 03 2010 INCREASE AMOUNT OF CONDENSATE RETURNED $31,600 $1,610 Implemented
DL0063 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,900 $166,850 Implemented
DL0063 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $22,000 $3,000 Implemented
DL0063 # 09 Y:2010 09 2010 REDUCE EXCESS STEAM BLEEDING $14,034 $419 Implemented