Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
115
matching recommendationsNAICS | 311919 | Other Snack Food Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0226 # 01 Y:2017 | 01 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,015 | $5,450 | Implemented |
BD0464 # 07 Y:2015 | 07 | 2015 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,313 | $750 | Implemented |
BD0464 # 09 Y:2015 | 09 | 2015 | SHUT OFF PILOTS IN STANDBY EQUIPMENT | $590 | $40 | Implemented |
BD0464 # 06 Y:2015 | 06 | 2015 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,364 | $2,900 | Implemented |
BD0464 # 04 Y:2015 | 04 | 2015 | INSTALL OCCUPANCY SENSORS | $6,685 | $3,075 | Implemented |
BD0464 # 02 Y:2015 | 02 | 2015 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $11,746 | $20,000 | Implemented |
BD0424 # 09 Y:2013 | 09 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,163 | $1,660 | Implemented |
BD0424 # 07 Y:2013 | 07 | 2013 | INSTALL OCCUPANCY SENSORS | $7,685 | $2,257 | Implemented |
BD0424 # 05 Y:2013 | 05 | 2013 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,527 | $8,640 | Implemented |
BD0424 # 02 Y:2013 | 02 | 2013 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,607 | $16,210 | Implemented |
UD0877 # 02 Y:2013 | 02 | 2013 | METER WASTE WATER | $18,660 | $1,000 | Implemented |
UD0877 # 09 Y:2013 | 09 | 2013 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $685 | $2,000 | Implemented |
UD0877 # 08 Y:2013 | 08 | 2013 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $61,182 | $25,000 | Implemented |
UD0877 # 06 Y:2013 | 06 | 2013 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $2,095 | $0 | Implemented |
UD0877 # 01 Y:2013 | 01 | 2013 | ELIMINATE THIRD SHIFT | $75,782 | $0 | Implemented |
OR0596 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,779 | $2,217 | Implemented |
OR0596 # 07 Y:2012 | 07 | 2012 | TREAT AND REUSE RINSE WATERS | $48,291 | $10,000 | Implemented |
NC0448 # 05 Y:2012 | 05 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $880 | $200 | Implemented |
NC0448 # 04 Y:2012 | 04 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,740 | $400 | Implemented |
NC0448 # 03 Y:2012 | 03 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,746 | $5,600 | Implemented |
SF0398 # 01 Y:2011 | 01 | 2011 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,251 | $0 | Implemented |
SF0398 # 04 Y:2011 | 04 | 2011 | AIR CONDITION ONLY SPACE NECESSARY | $4,965 | $424 | Implemented |
SF0398 # 07 Y:2011 | 07 | 2011 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $975 | $2,405 | Implemented |
SF0398 # 02 Y:2011 | 02 | 2011 | REPAIR AND ELIMINATE STEAM LEAKS | $4,412 | $0 | Implemented |
SF0398 # 05 Y:2011 | 05 | 2011 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $112,927 | $56,209 | Implemented |