IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0001 # 07 Y:2012 07 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $96 $160 Implemented
BS0001 # 09 Y:2012 09 2012 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,158 $2,282 Implemented
BD0404 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $31,392 $76,240 Implemented
BD0404 # 04 Y:2012 04 2012 INSTALL OCCUPANCY SENSORS $4,130 $8,000 Implemented
BD0404 # 05 Y:2012 05 2012 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $6,137 $20 Implemented
BD0404 # 06 Y:2012 06 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,573 $1,500 Implemented
BD0404 # 07 Y:2012 07 2012 REPAIR AND ELIMINATE STEAM LEAKS $1,669 $100 Implemented
LL0349 # 01 Y:2011 01 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,074 $4,720 Implemented
DL0064 # 02 Y:2011 02 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $7,944 $5,080 Implemented
DL0064 # 04 Y:2011 04 2011 UPGRADE CONTROLS ON COMPRESSORS $7,030 $11,300 Implemented
NC0417 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,199 $100 Implemented
NC0413 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,881 $100 Implemented
NC0413 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,796 $50 Implemented
NC0413 # 03 Y:2010 03 2010 INSULATE FEEDWATER TANK $283 $337 Implemented
NC0413 # 04 Y:2010 04 2010 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,066 $1,000 Implemented
MZ0053 # 01 Y:2010 01 2010 REPLACE BOILER $33,880 $115,000 Implemented
MZ0053 # 02 Y:2010 02 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $959 $1,000 Implemented
MZ0053 # 03 Y:2010 03 2010 RECOVER WASTE HEAT FROM EQUIPMENT $22,455 $10,000 Implemented
MZ0053 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,022 $33,660 Implemented
MZ0053 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $888 $1,550 Implemented
MZ0053 # 06 Y:2010 06 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $987 $0 Implemented
MZ0053 # 07 Y:2010 07 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $3,342 $1,160 Implemented
MZ0053 # 08 Y:2010 08 2010 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,601 $0 Implemented
MZ0053 # 09 Y:2010 09 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,207 $0 Implemented
MZ0053 # 10 Y:2010 10 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,916 $1,100 Implemented