Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
407
matching recommendationsNAICS | 31211 | Soft Drink and Ice Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0053 # 11 Y:2010 | 11 | 2010 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $14,987 | $5,000 | Implemented |
UM0370 # 01 Y:2010 | 01 | 2010 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $76,860 | $90,000 | Implemented |
UM0370 # 02 Y:2010 | 02 | 2010 | INSTALL OCCUPANCY SENSORS | $17,172 | $8,188 | Implemented |
UM0370 # 07 Y:2010 | 07 | 2010 | RECOVER WASTE HEAT FROM EQUIPMENT | $33,206 | $1,000 | Implemented |
UM0370 # 10 Y:2010 | 10 | 2010 | INSTALL STORM WINDOWS AND DOORS | $1,156 | $9,300 | Implemented |
DL0055 # 05 Y:2010 | 05 | 2010 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $82,808 | $125,000 | Implemented |
DL0055 # 06 Y:2010 | 06 | 2010 | USE DIRECT AIR SUPPLY TO EXHAUST HOODS | $9,000 | $3,000 | Implemented |
DL0055 # 07 Y:2010 | 07 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,600 | $1,200 | Implemented |
DL0055 # 10 Y:2010 | 10 | 2010 | KEEP EQUIPMENT CLEAN | $3,631 | $500 | Implemented |
DL0055 # 11 Y:2010 | 11 | 2010 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,631 | $1,830 | Implemented |
DL0055 # 12 Y:2010 | 12 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,467 | $6,000 | Implemented |
MI0191 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $47,683 | $1,210 | Implemented |
MI0191 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $8,572 | $5,300 | Implemented |
LE0298 # 02 Y:2010 | 02 | 2010 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $22,178 | $100,000 | Implemented |
LE0298 # 04 Y:2010 | 04 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,050 | $2,440 | Implemented |
LE0298 # 10 Y:2010 | 10 | 2010 | INSTALL OCCUPANCY SENSORS | $327 | $630 | Implemented |
UF0429 # 01 Y:2009 | 01 | 2009 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,635 | $0 | Implemented |
UF0429 # 02 Y:2009 | 02 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $19,766 | $0 | Implemented |
UF0429 # 05 Y:2009 | 05 | 2009 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $334 | $0 | Implemented |
UF0429 # 13 Y:2009 | 13 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $42,269 | $0 | Implemented |
UD0805 # 03 Y:2009 | 03 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $16,619 | $17,147 | Implemented |
UD0805 # 04 Y:2009 | 04 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,872 | $25,117 | Implemented |
UD0805 # 07 Y:2009 | 07 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,327 | $8,043 | Implemented |
UD0805 # 08 Y:2009 | 08 | 2009 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,938 | $6,703 | Implemented |
UD0805 # 09 Y:2009 | 09 | 2009 | REDUCE EXCESSIVE BOILER BLOWDOWN | $5,312 | $5,000 | Implemented |