IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

407

matching recommendations
Reset
NAICS 31211 Soft Drink and Ice Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0053 # 11 Y:2010 11 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $14,987 $5,000 Implemented
UM0370 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $76,860 $90,000 Implemented
UM0370 # 02 Y:2010 02 2010 INSTALL OCCUPANCY SENSORS $17,172 $8,188 Implemented
UM0370 # 07 Y:2010 07 2010 RECOVER WASTE HEAT FROM EQUIPMENT $33,206 $1,000 Implemented
UM0370 # 10 Y:2010 10 2010 INSTALL STORM WINDOWS AND DOORS $1,156 $9,300 Implemented
DL0055 # 05 Y:2010 05 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $82,808 $125,000 Implemented
DL0055 # 06 Y:2010 06 2010 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $9,000 $3,000 Implemented
DL0055 # 07 Y:2010 07 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $12,600 $1,200 Implemented
DL0055 # 10 Y:2010 10 2010 KEEP EQUIPMENT CLEAN $3,631 $500 Implemented
DL0055 # 11 Y:2010 11 2010 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $3,631 $1,830 Implemented
DL0055 # 12 Y:2010 12 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,467 $6,000 Implemented
MI0191 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $47,683 $1,210 Implemented
MI0191 # 05 Y:2010 05 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $8,572 $5,300 Implemented
LE0298 # 02 Y:2010 02 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $22,178 $100,000 Implemented
LE0298 # 04 Y:2010 04 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,050 $2,440 Implemented
LE0298 # 10 Y:2010 10 2010 INSTALL OCCUPANCY SENSORS $327 $630 Implemented
UF0429 # 01 Y:2009 01 2009 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,635 $0 Implemented
UF0429 # 02 Y:2009 02 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,766 $0 Implemented
UF0429 # 05 Y:2009 05 2009 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $334 $0 Implemented
UF0429 # 13 Y:2009 13 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $42,269 $0 Implemented
UD0805 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,619 $17,147 Implemented
UD0805 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,872 $25,117 Implemented
UD0805 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,327 $8,043 Implemented
UD0805 # 08 Y:2009 08 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,938 $6,703 Implemented
UD0805 # 09 Y:2009 09 2009 REDUCE EXCESSIVE BOILER BLOWDOWN $5,312 $5,000 Implemented