Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
164
matching recommendationsNAICS | 312112 | Bottled Water Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CC0040 # 05 Y:2024 | 05 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $21,675 | $0 | n/a |
CC0040 # 06 Y:2024 | 06 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,947 | $0 | n/a |
CC0040 # 07 Y:2024 | 07 | 2024 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $8,562 | $2,120 | n/a |
CC0040 # 08 Y:2024 | 08 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $5,668 | $93,870 | n/a |
CC0040 # 01 Y:2024 | 01 | 2024 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $14,256 | $2,000 | n/a |
TT0318 # 01 Y:2024 | 01 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $519,539 | $7,626,292 | n/a |
TT0318 # 08 Y:2024 | 08 | 2024 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,783 | $460 | n/a |
TT0318 # 06 Y:2024 | 06 | 2024 | PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT | $5,885 | $12,180 | n/a |
TT0318 # 04 Y:2024 | 04 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,027 | $65,640 | n/a |
TT0318 # 07 Y:2024 | 07 | 2024 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $4,912 | $15,000 | n/a |
TT0318 # 05 Y:2024 | 05 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,815 | $1,500 | n/a |
TT0318 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $17,101 | $94 | n/a |
TT0318 # 02 Y:2024 | 02 | 2024 | UPGRADE CONTROLS ON COMPRESSORS | $25,497 | $30,000 | n/a |
CC0035 # 04 Y:2024 | 04 | 2024 | RECOVER WASTE HEAT FROM EQUIPMENT | $3,601 | $4,550 | n/a |
CC0035 # 03 Y:2024 | 03 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,484 | $1,000 | n/a |
CC0035 # 05 Y:2024 | 05 | 2024 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $4,795 | $2,800 | n/a |
CC0035 # 02 Y:2024 | 02 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,395 | $4,578 | n/a |
CC0035 # 01 Y:2024 | 01 | 2024 | USE HEAT PUMP FOR SPACE CONDITIONING | $1,534 | $7,000 | n/a |
CC0035 # 06 Y:2024 | 06 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,865 | $0 | n/a |
IC0231 # 05 Y:2020 | 05 | 2020 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $5,416 | $0 | Implemented |
IC0231 # 04 Y:2020 | 04 | 2020 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $12,061 | $2,400 | Not Implemented |
IC0231 # 03 Y:2020 | 03 | 2020 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,211 | $50,440 | Implemented |
IC0231 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $21,285 | $6,673 | Implemented |
IC0231 # 01 Y:2020 | 01 | 2020 | OPTIMIZE PLANT POWER FACTOR | $15,040 | $26,145 | Implemented |
NL0034 # 06 Y:2019 | 06 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $238 | $500 | Implemented |