IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

188

matching recommendations
Reset
NAICS 31212 Breweries
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0021 # 04 Y:2014 04 2014 PAY BILLS ON TIME TO AVOID LATE FEES $1,181 $0 Implemented
IP0021 # 06 Y:2014 06 2014 INSTALL OCCUPANCY SENSORS $222 $118 Implemented
IP0021 # 08 Y:2014 08 2014 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,868 $5,580 Implemented
CO0677 # 02 Y:2013 02 2013 INSTALL / REPAIR INSULATION ON STEAM LINES $2,660 $1,620 Implemented
CO0677 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $0 Implemented
CO0677 # 05 Y:2013 05 2013 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $4,810 $0 Implemented
CO0677 # 06 Y:2013 06 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $640 $3,450 Implemented
WV0473 # 03 Y:2013 03 2013 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,804 $1,700 Implemented
WV0473 # 04 Y:2013 04 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,703 $1,000 Implemented
WV0473 # 05 Y:2013 05 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,539 $7,466 Implemented
WV0473 # 06 Y:2013 06 2013 INSULATE BARE EQUIPMENT $2,574 $3,281 Implemented
WV0473 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $497 $566 Implemented
WV0473 # 10 Y:2013 10 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $408 $29 Implemented
OR0591 # 01 Y:2012 01 2012 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $920,649 $25,909 Implemented
OR0591 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,274 $6,968 Implemented
UM0352 # 01 Y:2009 01 2009 INSULATE FEEDWATER TANK $8,739 $3,454 Implemented
UM0352 # 03 Y:2009 03 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,300 $1,700 Implemented
UM0352 # 05 Y:2009 05 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,200 $0 Implemented
UM0352 # 07 Y:2009 07 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,454 $0 Implemented
UM0352 # 08 Y:2009 08 2009 INSTALL OCCUPANCY SENSORS $504 $920 Implemented
UM0352 # 09 Y:2009 09 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,944 $1,200 Implemented
DL0015 # 02 Y:2008 02 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,400 $3,500 Implemented
DL0015 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $19,500 $20,000 Implemented
DL0015 # 04 Y:2008 04 2008 ADD AREA LIGHTING SWITCHES $370 $1,500 Implemented
DL0015 # 05 Y:2008 05 2008 INSTALL / REPAIR INSULATION ON STEAM LINES $5,911 $2,500 Implemented