IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

423

matching recommendations
Reset
NAICS 313 Textile Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0493 # 04 Y:2013 04 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,550 $1,386 Implemented
NC0493 # 05 Y:2013 05 2013 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $37,850 $6,372 Implemented
NC0493 # 09 Y:2013 09 2013 REDUCE EXCESSIVE BOILER BLOWDOWN $430 $0 Implemented
NC0493 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,165 $100 Implemented
NC0493 # 13 Y:2013 13 2013 CONDENSE OPERATION INTO ONE BUILDING $21,473 $10,000 Implemented
MAS033 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,549 $7,500 Implemented
LE0345 # 02 Y:2012 02 2012 REPAIR AND ELIMINATE STEAM LEAKS $16,178 $750 Implemented
LE0345 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,658 $550 Implemented
LE0345 # 05 Y:2012 05 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $21,763 $3,800 Implemented
LE0345 # 07 Y:2012 07 2012 REPLACE BOILER $226,873 $560,000 Implemented
LE0345 # 11 Y:2012 11 2012 INSTALL / REPAIR INSULATION ON STEAM LINES $53,742 $3,200 Implemented
MZ0082 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $18,500 $17,720 Implemented
MZ0082 # 04 Y:2012 04 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,870 $850 Implemented
TT0078 # 03 Y:2011 03 2011 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $7,023 $1,480 Implemented
TT0078 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,720 $800 Implemented
UA0066 # 01 Y:2011 01 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,215 $62,771 Implemented
UA0066 # 03 Y:2011 03 2011 UPGRADE CONTROLS ON COMPRESSORS $22,864 $30,000 Implemented
UA0066 # 04 Y:2011 04 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,677 $640 Implemented
UA0066 # 05 Y:2011 05 2011 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $22,848 $11,400 Implemented
UA0066 # 06 Y:2011 06 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $98,887 $13,568 Implemented
UA0066 # 10 Y:2011 10 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,963 $3,900 Implemented
NC0424 # 02 Y:2011 02 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $30,681 $112,768 Implemented
NC0424 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,430 $4,435 Implemented
NC0424 # 04 Y:2011 04 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $16,685 $78,795 Implemented
NC0424 # 05 Y:2011 05 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,791 $100 Implemented