IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

106

matching recommendations
Reset
NAICS 31499 All Other Textile Product Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LL0278 # 05 Y:2007 05 2007 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $2,388 $542 Implemented
LL0278 # 06 Y:2007 06 2007 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,920 $1,147 Implemented
LL0278 # 07 Y:2007 07 2007 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,744 $1,050 Implemented
LL0278 # 08 Y:2007 08 2007 INSULATE BARE EQUIPMENT $1,696 $912 Implemented
LL0278 # 11 Y:2007 11 2007 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $203 $120 Implemented
MS0292 # 01 Y:2006 01 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $14,743 $34,278 Implemented
MS0292 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,311 $46,268 Implemented
MS0292 # 03 Y:2006 03 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,836 $21,282 Implemented
MS0292 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,405 $231 Implemented
GT0817 # 01 Y:2006 01 2006 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,981 $1,333 Implemented
GT0817 # 05 Y:2006 05 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,652 $500 Implemented
GT0817 # 06 Y:2006 06 2006 UPGRADE CONTROLS ON COMPRESSORS $2,666 $1,500 Implemented
SU0223 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,353 $135 Implemented
GT0804 # 02 Y:2005 02 2005 USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING $289 $500 Implemented
GT0804 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,926 $12,224 Implemented
GT0804 # 05 Y:2005 05 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,432 $2,500 Implemented
GT0804 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,303 $1,600 Implemented
MA0569 # 02 Y:2005 02 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,234 $7,312 Implemented
MA0569 # 03 Y:2005 03 2005 INSULATE BARE EQUIPMENT $1,082 $494 Implemented
MA0569 # 04 Y:2005 04 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $825 $5,248 Implemented
WI0447 # 02 Y:2003 02 2003 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $6,058 $4,500 Implemented
WI0447 # 05 Y:2003 05 2003 INSTALL OCCUPANCY SENSORS $1,938 $2,600 Implemented
TA0056 # 03 Y:2003 03 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,726 $0 Implemented
TA0056 # 04 Y:2003 04 2003 INSTALL TIMERS AND/OR THERMOSTATS $880 $325 Implemented
TA0056 # 05 Y:2003 05 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $770 $0 Implemented