IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

342

matching recommendations
Reset
NAICS 321113 Sawmills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0432 # 05 Y:2011 05 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $2,144 $2,000 Implemented
WV0432 # 04 Y:2011 04 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,762 $290 Implemented
OR0570 # 01 Y:2011 01 2011 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $19,863 $1,120 Implemented
OR0571 # 02 Y:2011 02 2011 UPGRADE CONTROLS ON COMPRESSORS $13,809 $52,890 Implemented
OR0571 # 03 Y:2011 03 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,616 $2,200 Implemented
OR0571 # 04 Y:2011 04 2011 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN $1,906 $7,000 Implemented
OR0571 # 06 Y:2011 06 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,292 $44,400 Implemented
UW0045 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,963 $1,930 Implemented
UW0045 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $5,260 $220 Implemented
UW0045 # 03 Y:2011 03 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,190 $28,362 Implemented
UW0044 # 01 Y:2011 01 2011 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $23,619 $168,530 Implemented
UW0044 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,956 $1,780 Implemented
OR0563 # 02 Y:2010 02 2010 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $219,003 $250,000 Implemented
OR0563 # 03 Y:2010 03 2010 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $46,600 $244,000 Implemented
OR0547 # 02 Y:2009 02 2009 KEEP BOILER TUBES CLEAN $39,218 $44,000 Implemented
OR0547 # 03 Y:2009 03 2009 INSTALL / REPAIR INSULATION ON STEAM LINES $939 $1,042 Implemented
OR0547 # 04 Y:2009 04 2009 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $705 $0 Implemented
OR0547 # 05 Y:2009 05 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,091 $5,000 Implemented
OR0547 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $16,829 $20,313 Implemented
OR0547 # 07 Y:2009 07 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,257 $500 Implemented
OR0547 # 08 Y:2009 08 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,090 $500 Implemented
OR0547 # 09 Y:2009 09 2009 COMBINE UTILITY METERS $6,709 $0 Implemented
OR0547 # 10 Y:2009 10 2009 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $2,270 $15,676 Implemented
UA0035 # 01 Y:2009 01 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $10,780 $1,500 Implemented
UA0035 # 04 Y:2009 04 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,882 $87,077 Implemented