Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
273
matching recommendationsNAICS | 32121 | Veneer, Plywood, and Engineered Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0679 # 04 Y:2016 | 04 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $31,513 | $47,575 | Implemented |
OR0679 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,472 | $0 | Implemented |
OR0664 # 03 Y:2016 | 03 | 2016 | INSTALL SPECTRAL REFLECTORS / DELAMP | $12,507 | $32,393 | Implemented |
OR0664 # 04 Y:2016 | 04 | 2016 | UPGRADE CONVEYORS | $74,609 | $242,718 | Not Implemented |
OR0664 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $1,310 | $2,584 | Not Implemented |
OR0664 # 01 Y:2016 | 01 | 2016 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $2,739 | $0 | Not Implemented |
OR0658 # 01 Y:2015 | 01 | 2015 | MODIFY CURRENT INCENTIVE PROGRAM | $22,712 | $60,000 | Not Implemented |
OR0658 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $680,062 | $427,000 | Implemented |
OR0658 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $54,203 | $59,203 | Implemented |
OR0658 # 04 Y:2015 | 04 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,781 | $0 | Not Implemented |
OR0657 # 02 Y:2015 | 02 | 2015 | INSULATE BARE EQUIPMENT | $24,174 | $32,596 | Not Implemented |
OR0657 # 03 Y:2015 | 03 | 2015 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $207,496 | $694,826 | Not Implemented |
OR0657 # 01 Y:2015 | 01 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $48,205 | $50,205 | Implemented |
OR0640 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,092 | $12,092 | Implemented |
OR0640 # 03 Y:2014 | 03 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,298 | $1,020 | Not Implemented |
OR0640 # 04 Y:2014 | 04 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $20,241 | $67,550 | Not Implemented |
OR0640 # 01 Y:2014 | 01 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $131,605 | $242,261 | Implemented |
OR0640 # 02 Y:2014 | 02 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,455 | $0 | Not Implemented |
OR0639 # 02 Y:2014 | 02 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $8,461 | $360 | Implemented |
OR0639 # 05 Y:2014 | 05 | 2014 | OPTIMIZE PLANT POWER FACTOR | $3,528 | $15,201 | Not Implemented |
OR0639 # 01 Y:2014 | 01 | 2014 | IMPROVE COMBUSTION CONTROL CAPABILITY | $14,677 | $12,315 | Implemented |
OR0639 # 03 Y:2014 | 03 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,572 | $7,500 | Not Implemented |
OR0639 # 04 Y:2014 | 04 | 2014 | INSULATE BARE EQUIPMENT | $7,377 | $7,643 | Implemented |
OR0638 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,466 | $8,550 | Not Implemented |
OR0638 # 06 Y:2014 | 06 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $40,207 | $13,800 | Not Implemented |