IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

273

matching recommendations
Reset
NAICS 32121 Veneer, Plywood, and Engineered Wood Product Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0761 # 04 Y:2022 04 2022 MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS $31,013 $150,000 Not Implemented
OR0761 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,236 $26,406 Not Implemented
OR0761 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,913 $1,078 Implemented
OR0761 # 02 Y:2022 02 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,934 $9,934 Implemented
OR0750 # 05 Y:2022 05 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $87,087 $87,086 Not Implemented
OR0750 # 03 Y:2022 03 2022 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $32,591 $4,338 Not Implemented
OR0750 # 01 Y:2022 01 2022 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,607 $0 Not Implemented
OR0750 # 02 Y:2022 02 2022 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,128 $0 Not Implemented
OR0750 # 06 Y:2022 06 2022 OPTIMIZE PLANT POWER FACTOR $49,792 $155,954 Not Implemented
OR0750 # 04 Y:2022 04 2022 INCREASE USE OF AUTOMATION $149,543 $65,909 Not Implemented
OR0728 # 02 Y:2019 02 2019 INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS $29,427 $34,054 Not Implemented
OR0728 # 03 Y:2019 03 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $8,174 $4,152 Not Implemented
OR0728 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,008 $0 Implemented
OR0728 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $29,023 $34,574 Not Implemented
OR0727 # 04 Y:2019 04 2019 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,255 $770 Implemented
OR0727 # 01 Y:2019 01 2019 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,245,906 $300,000 Not Implemented
OR0727 # 02 Y:2019 02 2019 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION $125,609 $904,500 Not Implemented
OR0727 # 03 Y:2019 03 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,870 $19,006 Implemented
OR0718 # 03 Y:2019 03 2019 VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE $7,386 $27,337 Not Implemented
OR0718 # 02 Y:2019 02 2019 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $47,893 $5,142 Not Implemented
OR0718 # 01 Y:2019 01 2019 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $84,306 $71,155 Not Implemented
OR0679 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,003 $10,369 Not Implemented
OR0679 # 02 Y:2016 02 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $20,472 $0 Implemented
OR0679 # 06 Y:2016 06 2016 REPLACE BOILER $48,912 $250,000 Not Implemented
OR0679 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,613 $47,385 Implemented