Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
273
matching recommendationsNAICS | 32121 | Veneer, Plywood, and Engineered Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0761 # 04 Y:2022 | 04 | 2022 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $31,013 | $150,000 | Not Implemented |
OR0761 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,236 | $26,406 | Not Implemented |
OR0761 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,913 | $1,078 | Implemented |
OR0761 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,934 | $9,934 | Implemented |
OR0750 # 05 Y:2022 | 05 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $87,087 | $87,086 | Not Implemented |
OR0750 # 03 Y:2022 | 03 | 2022 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $32,591 | $4,338 | Not Implemented |
OR0750 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $8,607 | $0 | Not Implemented |
OR0750 # 02 Y:2022 | 02 | 2022 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,128 | $0 | Not Implemented |
OR0750 # 06 Y:2022 | 06 | 2022 | OPTIMIZE PLANT POWER FACTOR | $49,792 | $155,954 | Not Implemented |
OR0750 # 04 Y:2022 | 04 | 2022 | INCREASE USE OF AUTOMATION | $149,543 | $65,909 | Not Implemented |
OR0728 # 02 Y:2019 | 02 | 2019 | INSTALL MOTOR VOLTAGE CONTROLLER ON LIGHTLY LOADED MOTORS | $29,427 | $34,054 | Not Implemented |
OR0728 # 03 Y:2019 | 03 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $8,174 | $4,152 | Not Implemented |
OR0728 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,008 | $0 | Implemented |
OR0728 # 01 Y:2019 | 01 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $29,023 | $34,574 | Not Implemented |
OR0727 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,255 | $770 | Implemented |
OR0727 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,245,906 | $300,000 | Not Implemented |
OR0727 # 02 Y:2019 | 02 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $125,609 | $904,500 | Not Implemented |
OR0727 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,870 | $19,006 | Implemented |
OR0718 # 03 Y:2019 | 03 | 2019 | VENTILATION SYSTEM TO SHUT OFF WHEN ROOM IS NOT IN USE | $7,386 | $27,337 | Not Implemented |
OR0718 # 02 Y:2019 | 02 | 2019 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $47,893 | $5,142 | Not Implemented |
OR0718 # 01 Y:2019 | 01 | 2019 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $84,306 | $71,155 | Not Implemented |
OR0679 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $10,003 | $10,369 | Not Implemented |
OR0679 # 02 Y:2016 | 02 | 2016 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $20,472 | $0 | Implemented |
OR0679 # 06 Y:2016 | 06 | 2016 | REPLACE BOILER | $48,912 | $250,000 | Not Implemented |
OR0679 # 05 Y:2016 | 05 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,613 | $47,385 | Implemented |