Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
31
matching recommendationsNAICS | 321211 | Hardwood Veneer and Plywood Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0728 # 04 Y:2019 | 04 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,008 | $0 | Implemented |
OR0638 # 07 Y:2014 | 07 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $21,180 | $10,000 | Implemented |
OR0638 # 04 Y:2014 | 04 | 2014 | MINIMIZE WATER USAGE | $1,003 | $0 | Implemented |
OR0573 # 05 Y:2011 | 05 | 2011 | INSTALL / REPAIR INSULATION ON STEAM LINES | $11,543 | $7,806 | Implemented |
OR0564 # 05 Y:2010 | 05 | 2010 | USE OPTIMUM THICKNESS INSULATION | $64,658 | $105,222 | Implemented |
OR0564 # 02 Y:2010 | 02 | 2010 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $31,314 | $31,314 | Implemented |
OR0555 # 04 Y:2010 | 04 | 2010 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,054 | $1 | Implemented |
OR0555 # 03 Y:2010 | 03 | 2010 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $15,978 | $11,900 | Implemented |
OR0548 # 08 Y:2009 | 08 | 2009 | INSTALL / REPAIR INSULATION ON STEAM LINES | $3,500 | $600 | Implemented |
OR0548 # 07 Y:2009 | 07 | 2009 | UPGRADE CONTROLS ON COMPRESSORS | $7,349 | $0 | Implemented |
OR0548 # 05 Y:2009 | 05 | 2009 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,882 | $9,900 | Implemented |
OR0548 # 04 Y:2009 | 04 | 2009 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $15,295 | $0 | Implemented |
OR0548 # 02 Y:2009 | 02 | 2009 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $47,605 | $128,300 | Implemented |
OR0519 # 07 Y:2007 | 07 | 2007 | UPGRADE CONTROLS ON COMPRESSORS | $52,800 | $40,500 | Implemented |
OR0519 # 09 Y:2007 | 09 | 2007 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $47,500 | $109,300 | Implemented |
OR0519 # 08 Y:2007 | 08 | 2007 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $12,400 | $12,400 | Implemented |
OR0519 # 06 Y:2007 | 06 | 2007 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $102,000 | $33,700 | Implemented |
OR0519 # 05 Y:2007 | 05 | 2007 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $16,700 | $35,900 | Implemented |
OR0519 # 02 Y:2007 | 02 | 2007 | REDUCE EXCESS STEAM BLEEDING | $548,400 | $28,000 | Implemented |
OR0468 # 10 Y:2004 | 10 | 2004 | TURN OFF EQUIPMENT WHEN NOT IN USE | $15,800 | $26,600 | Implemented |
OR0468 # 09 Y:2004 | 09 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $14,800 | $15,700 | Implemented |
OR0468 # 08 Y:2004 | 08 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,700 | $13,800 | Implemented |
OR0468 # 07 Y:2004 | 07 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $29,200 | $27,800 | Implemented |
OR0468 # 04 Y:2004 | 04 | 2004 | UPGRADE CONTROLS ON COMPRESSORS | $22,000 | $1,200 | Implemented |
OR0468 # 03 Y:2004 | 03 | 2004 | REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH | $3,000 | $0 | Implemented |