Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
110
matching recommendationsNAICS | 321212 | Softwood Veneer and Plywood Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
OR0761 # 04 Y:2022 | 04 | 2022 | MODIFY FACILITY TO AVOID EXCESS MAINTENANCE COSTS | $31,013 | $150,000 | Not Implemented |
OR0761 # 03 Y:2022 | 03 | 2022 | OPTIMIZE PLANT POWER FACTOR | $6,236 | $26,406 | Not Implemented |
OR0761 # 02 Y:2022 | 02 | 2022 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,934 | $9,934 | Implemented |
OR0761 # 01 Y:2022 | 01 | 2022 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,913 | $1,078 | Implemented |
OR0727 # 03 Y:2019 | 03 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $6,870 | $19,006 | Implemented |
OR0727 # 01 Y:2019 | 01 | 2019 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $2,245,906 | $300,000 | Not Implemented |
OR0727 # 04 Y:2019 | 04 | 2019 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,255 | $770 | Implemented |
OR0727 # 02 Y:2019 | 02 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $125,609 | $904,500 | Not Implemented |
OR0658 # 01 Y:2015 | 01 | 2015 | MODIFY CURRENT INCENTIVE PROGRAM | $22,712 | $60,000 | Not Implemented |
OR0658 # 04 Y:2015 | 04 | 2015 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $20,781 | $0 | Not Implemented |
OR0658 # 02 Y:2015 | 02 | 2015 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $680,062 | $427,000 | Implemented |
OR0658 # 03 Y:2015 | 03 | 2015 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $54,203 | $59,203 | Implemented |
OR0640 # 03 Y:2014 | 03 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $1,298 | $1,020 | Not Implemented |
OR0640 # 05 Y:2014 | 05 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,092 | $12,092 | Implemented |
OR0640 # 04 Y:2014 | 04 | 2014 | INSTALL EQUIPMENT TO UTILIZE WASTE FUEL | $20,241 | $67,550 | Not Implemented |
OR0640 # 01 Y:2014 | 01 | 2014 | REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT | $131,605 | $242,261 | Implemented |
OR0640 # 02 Y:2014 | 02 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $2,455 | $0 | Not Implemented |
OR0635 # 04 Y:2014 | 04 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $14,844 | $15,843 | Not Implemented |
OR0635 # 03 Y:2014 | 03 | 2014 | INCREASE AMOUNT OF CONDENSATE RETURNED | $56,191 | $56,191 | Not Implemented |
OR0635 # 05 Y:2014 | 05 | 2014 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $23,961 | $9,068 | Not Implemented |
OR0635 # 01 Y:2014 | 01 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $29,475 | $7,174 | Not Implemented |
OR0635 # 07 Y:2014 | 07 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $40,819 | $43,800 | Not Implemented |
OR0635 # 02 Y:2014 | 02 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,287 | $1,628 | Not Implemented |
OR0635 # 06 Y:2014 | 06 | 2014 | INSTALL SPECTRAL REFLECTORS / DELAMP | $181,002 | $170,561 | Not Implemented |
OR0633 # 01 Y:2014 | 01 | 2014 | UPGRADE CONTROLS ON COMPRESSORS | $107,219 | $4,630 | Not Implemented |