Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
464
matching recommendationsNAICS | 32199 | All Other Wood Product Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0141 # 01 Y:2020 | 01 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,094 | $50 | Not Implemented |
OR0722 # 01 Y:2019 | 01 | 2019 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $42,047 | $1,000 | Implemented |
OR0722 # 02 Y:2019 | 02 | 2019 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $17,875 | $0 | Implemented |
OR0722 # 03 Y:2019 | 03 | 2019 | USE OPTIMUM TEMPERATURE | $6,191 | $0 | Not Implemented |
OR0722 # 04 Y:2019 | 04 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,107 | $0 | Implemented |
OR0722 # 05 Y:2019 | 05 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,488 | $1,110 | Not Implemented |
OR0722 # 06 Y:2019 | 06 | 2019 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $28,751 | $129,960 | Not Implemented |
OR0722 # 07 Y:2019 | 07 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $10,941 | $15,179 | Not Implemented |
MA0807 # 01 Y:2019 | 01 | 2019 | REDUCE VENTILATION AIR | $10,917 | $100 | Implemented |
MA0807 # 02 Y:2019 | 02 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,356 | $9,356 | Implemented |
MA0807 # 03 Y:2019 | 03 | 2019 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $6,808 | $17,300 | Not Implemented |
MA0807 # 04 Y:2019 | 04 | 2019 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,547 | $10,850 | Not Implemented |
MA0807 # 05 Y:2019 | 05 | 2019 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $1,241 | $5,413 | Implemented |
MA0807 # 06 Y:2019 | 06 | 2019 | INSTALL / REPAIR INSULATION ON STEAM LINES | $558 | $470 | Implemented |
UA0211 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,405 | $24,659 | Not Implemented |
UA0211 # 02 Y:2019 | 02 | 2019 | INSTALL OCCUPANCY SENSORS | $639 | $1,455 | Not Implemented |
UA0211 # 03 Y:2019 | 03 | 2019 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,492 | $1,345 | Not Implemented |
UA0211 # 04 Y:2019 | 04 | 2019 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,928 | $100 | Not Implemented |
UA0211 # 05 Y:2019 | 05 | 2019 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,287 | $791 | Not Implemented |
UA0211 # 06 Y:2019 | 06 | 2019 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $9,787 | $16,620 | Not Implemented |
UA0211 # 07 Y:2019 | 07 | 2019 | USE OPTIMUM SIZE AND CAPACITY EQUIPMENT | $374,108 | $1,310,277 | Implemented |
UA0211 # 08 Y:2019 | 08 | 2019 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $26,196 | $150 | Implemented |
UA0211 # 09 Y:2019 | 09 | 2019 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $2,027,932 | $1,000,000 | Not Implemented |
UA0203 # 01 Y:2019 | 01 | 2019 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,597 | $23,433 | Implemented |
UA0203 # 02 Y:2019 | 02 | 2019 | USE PHOTOCELL CONTROLS | $1,777 | $7,719 | Implemented |