Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
1,268
matching recommendationsNAICS | 322 | Paper Manufacturing |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NT0014 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,486 | $1,441 | Implemented |
NT0014 # 03 Y:2023 | 03 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $955 | $0 | Implemented |
NT0014 # 05 Y:2023 | 05 | 2023 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $5,512 | $0 | Implemented |
NT0014 # 01 Y:2023 | 01 | 2023 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $9,483 | $1,258 | Implemented |
NT0014 # 02 Y:2023 | 02 | 2023 | CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD | $6,006 | $6,160 | Implemented |
NL0079 # 03 Y:2023 | 03 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,699 | $10,600 | Implemented |
NL0079 # 02 Y:2023 | 02 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $11,509 | $4,500 | Implemented |
NL0079 # 01 Y:2023 | 01 | 2023 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $30,717 | $54,394 | Implemented |
NL0079 # 06 Y:2023 | 06 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $3,953 | $392 | Implemented |
NL0079 # 04 Y:2023 | 04 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $6,949 | $768 | Implemented |
NL0079 # 07 Y:2023 | 07 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,356 | $2,892 | Implemented |
NL0079 # 05 Y:2023 | 05 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,292 | $128 | Implemented |
NL0079 # 08 Y:2023 | 08 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,809 | $2,875 | Implemented |
UW2304 # 03 Y:2023 | 03 | 2023 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $148,199 | $381,066 | Implemented |
UW2304 # 02 Y:2023 | 02 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $5,854 | $372 | Implemented |
UW2304 # 04 Y:2023 | 04 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $848 | $937 | Implemented |
UW2304 # 01 Y:2023 | 01 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $28,885 | $0 | Implemented |
LE0542 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,207 | $1,900 | Implemented |
LE0542 # 04 Y:2023 | 04 | 2023 | OPTIMIZE PLANT POWER FACTOR | $5,492 | $12,810 | Implemented |
DL0218 # 01 Y:2023 | 01 | 2023 | REDUCE VENTILATION AIR | $11,809 | $0 | Implemented |
DL0218 # 05 Y:2023 | 05 | 2023 | RECOVER WASTE HEAT FROM EQUIPMENT | $11,159 | $10,000 | Implemented |
DL0218 # 03 Y:2023 | 03 | 2023 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $3,402 | $750 | Implemented |
DL0218 # 02 Y:2023 | 02 | 2023 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $90,882 | $0 | Implemented |
CM1015 # 02 Y:2022 | 02 | 2022 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,380 | $23,925 | Implemented |
CM1015 # 04 Y:2022 | 04 | 2022 | REPLACE BOILER | $9,756 | $43,140 | Implemented |