IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,268

matching recommendations
Reset
NAICS 322 Paper Manufacturing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LE0303 # 02 Y:2010 02 2010 INSTALL TIMERS AND/OR THERMOSTATS $10,520 $650 Implemented
LE0303 # 09 Y:2010 09 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,351 $800 Implemented
LE0303 # 10 Y:2010 10 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,131 $15 Implemented
LE0303 # 11 Y:2010 11 2010 RECOVER WASTE HEAT FROM EQUIPMENT $973 $1,000 Implemented
LL0333 # 01 Y:2010 01 2010 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $2,585,020 $273,500 Implemented
LL0333 # 02 Y:2010 02 2010 REPAIR AND ELIMINATE STEAM LEAKS $288,465 $36,500 Implemented
LL0333 # 05 Y:2010 05 2010 INSULATE BARE EQUIPMENT $3,966 $5,315 Implemented
CO0640 # 01 Y:2010 01 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $11,720 $1,140 Implemented
CO0640 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,710 $18,500 Implemented
CO0640 # 06 Y:2010 06 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $530 $3,060 Implemented
SU0297 # 01 Y:2010 01 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $30,345 $0 Implemented
SU0297 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $11,458 $697 Implemented
SU0297 # 05 Y:2010 05 2010 REPAIR OR REPLACE STEAM TRAPS $29,835 $5,275 Implemented
SU0297 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,260 $650 Implemented
SU0297 # 08 Y:2010 08 2010 OPTIMIZE PLANT POWER FACTOR $18,693 $24,129 Implemented
SU0297 # 10 Y:2010 10 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $21,058 $45,795 Implemented
SU0297 # 11 Y:2010 11 2010 UPGRADE OBSOLETE EQUIPMENT $1,054 $4,725 Implemented
UW0040 # 01 Y:2010 01 2010 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $977,184 $420,000 Implemented
UW0040 # 02 Y:2010 02 2010 KEEP BOILER TUBES CLEAN $82,215 $50,000 Implemented
WV0401 # 02 Y:2010 02 2010 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $57,379 $6,240 Implemented
WV0401 # 03 Y:2010 03 2010 USE "HEAT WHEEL" OR OTHER HEAT EXCHANGER TO CROSS-EXCHANGE BUILDING EXHAUST AIR WITH MAKE-UP AIR $38,419 $128,000 Implemented
WV0401 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,792 $7,958 Implemented
WV0401 # 06 Y:2010 06 2010 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $11,226 $20,400 Implemented
WV0401 # 08 Y:2010 08 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,432 $2,028 Implemented
WV0401 # 09 Y:2010 09 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,622 $312 Implemented