Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
326
matching recommendationsNAICS | 3221 | Pulp, Paper, and Paperboard Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SU0213 # 04 Y:2005 | 04 | 2005 | PAY BILLS ON TIME TO AVOID LATE FEES | $3,146 | $0 | Implemented |
SU0213 # 05 Y:2005 | 05 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $977 | $0 | Implemented |
SU0213 # 06 Y:2005 | 06 | 2005 | USE SYNTHETIC LUBRICANT | $23,908 | $1,000 | Implemented |
SU0213 # 07 Y:2005 | 07 | 2005 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,469 | $901 | Implemented |
SU0213 # 08 Y:2005 | 08 | 2005 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,629 | $494 | Implemented |
SU0213 # 09 Y:2005 | 09 | 2005 | INSTALL / REPAIR INSULATION ON STEAM LINES | $22,902 | $5,674 | Implemented |
SU0213 # 10 Y:2005 | 10 | 2005 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $70,404 | $35,100 | Implemented |
SU0213 # 12 Y:2005 | 12 | 2005 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $153,447 | $120,000 | Implemented |
WI0495 # 09 Y:2005 | 09 | 2005 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $242 | $200 | Implemented |
WI0495 # 07 Y:2005 | 07 | 2005 | USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR | $1,135 | $1,500 | Implemented |
WI0495 # 05 Y:2005 | 05 | 2005 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,165 | $0 | Implemented |
WI0495 # 03 Y:2005 | 03 | 2005 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,320 | $360 | Implemented |
WI0495 # 02 Y:2005 | 02 | 2005 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $14,256 | $32,760 | Implemented |
UM0276 # 01 Y:2005 | 01 | 2005 | USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS | $206,100 | $96,000 | Implemented |
UM0276 # 02 Y:2005 | 02 | 2005 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $4,572 | $2,500 | Implemented |
MA0567 # 01 Y:2004 | 01 | 2004 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $70,900 | $270,000 | Implemented |
MA0567 # 04 Y:2004 | 04 | 2004 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $8,762 | $1,000 | Implemented |
MA0567 # 05 Y:2004 | 05 | 2004 | INSULATE BARE EQUIPMENT | $4,156 | $6,867 | Implemented |
MA0567 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $1,615 | $1,369 | Implemented |
MA0566 # 01 Y:2004 | 01 | 2004 | RECOVER WASTE HEAT FROM EQUIPMENT | $148,951 | $35,885 | Implemented |
MA0566 # 02 Y:2004 | 02 | 2004 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $113,441 | $191,180 | Implemented |
MA0566 # 05 Y:2004 | 05 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $33,400 | $20,000 | Implemented |
MA0566 # 07 Y:2004 | 07 | 2004 | INSULATE BARE EQUIPMENT | $5,889 | $3,076 | Implemented |
MA0559 # 03 Y:2004 | 03 | 2004 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $36,905 | $15,475 | Implemented |
MA0559 # 05 Y:2004 | 05 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,349 | $11,346 | Implemented |